Discover Opportunities months before the RFP drops
Learn more →Works include approx. 1,797 LF of 8" DIP; 6 EA fire hydrant; 1,200 TN hot mix asphalt (grading SX) (75) (PG 58-28); 50 LF of 8" DIP (Restrained Joint). See outside link.
Posted Date
Nov 21, 2025
Due Date
Jan 28, 2026
Release: Nov 21, 2025
Close: Jan 28, 2026
Works include approx. 1,797 LF of 8" DIP; 6 EA fire hydrant; 1,200 TN hot mix asphalt (grading SX) (75) (PG 58-28); 50 LF of 8" DIP (Restrained Joint). See outside link.
AvailableInstall 18" diameter storm drain pipe and inlets, as well as miscellaneous drainage culverts, on a portion of the south side of road. Project will also include potholing, removals, grading, concrete valley pan, and asphalt paving the existing ditches and driveways within the project area.
Posted Date
Aug 15, 2025
Due Date
Sep 30, 2025
Release: Aug 15, 2025
Close: Sep 30, 2025
Install 18" diameter storm drain pipe and inlets, as well as miscellaneous drainage culverts, on a portion of the south side of road. Project will also include potholing, removals, grading, concrete valley pan, and asphalt paving the existing ditches and driveways within the project area.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis