Discover Opportunities months before the RFP drops
Learn more →Scope of work generally includes the electrical construction modifications required for the improvements being constructed under the General Construction Contract including all equipment, building electrical, SCADA and control system improvements. Electrical contract also includes furnishing and installing replacement electric actuators for the existing filtration valves (valves to remain).
Posted Date
Dec 9, 2025
Due Date
Jan 5, 2026
Release: Dec 9, 2025
Close: Jan 5, 2026
Scope of work generally includes the electrical construction modifications required for the improvements being constructed under the General Construction Contract including all equipment, building electrical, SCADA and control system improvements. Electrical contract also includes furnishing and installing replacement electric actuators for the existing filtration valves (valves to remain).
Availablehe scope of work includes, the conversion of the existing 1.0 MG finished water storage tank into a final clearwell with internal baffling, building expansion including installation of new flocculation tanks, lamella type plate clarifiers, and site piping reconfiguration. Flocculation and clarification system upgrades include replacing conventional clarifiers with new Lamella type plate clarifiers, installation of new flocculation tanks with flash mixing, demolition of an existing concrete clarifier, expansion / renovation of the existing water treatment plant building and all general/mechanical construction required. Site construction generally includes exterior and interior piping modifications include relocating finished water piping, new 16-IN raw water feed line, installation of new vaults and modification of existing vaults, demolition of piping to be abandoned, and implementing/maintaining temporary bypass piping.
Posted Date
Dec 9, 2025
Due Date
Jan 5, 2026
Release: Dec 9, 2025
Close: Jan 5, 2026
he scope of work includes, the conversion of the existing 1.0 MG finished water storage tank into a final clearwell with internal baffling, building expansion including installation of new flocculation tanks, lamella type plate clarifiers, and site piping reconfiguration. Flocculation and clarification system upgrades include replacing conventional clarifiers with new Lamella type plate clarifiers, installation of new flocculation tanks with flash mixing, demolition of an existing concrete clarifier, expansion / renovation of the existing water treatment plant building and all general/mechanical construction required. Site construction generally includes exterior and interior piping modifications include relocating finished water piping, new 16-IN raw water feed line, installation of new vaults and modification of existing vaults, demolition of piping to be abandoned, and implementing/maintaining temporary bypass piping.
AvailableResidential refuse collection, removal, and disposal of garbage, rubbish, white goods, and yard waste.
Posted Date
Nov 7, 2025
Due Date
Nov 25, 2025
Release: Nov 7, 2025
Close: Nov 25, 2025
Residential refuse collection, removal, and disposal of garbage, rubbish, white goods, and yard waste.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis