Discover Opportunities months before the RFP drops
Learn more →Demolishing three existing buildings in the rear of the high school to allow for three new free- standing buildings. One building consists of restrooms and concessions with the stadium spectators with two jv locker/restrooms. One building consists of two varsity locker rooms with a weight room. One building is a free-standing storage building for field equipment. Plumbing: the plumbing scope consists of upgrades to existing utility infrastructure for domestic water and natural gas services, and sanitary and storm sewer for buildings a and b. The systems are designed to meet the 2023 kentucky plumbing code. Buildings a and b each have a separate gas-fired water heater and recirculation pump system to serve all fixtures. Mechanical: the hvac system for the project consists of two (2) 100% outside air energy recovery units for heating, cooling and ventilation for both building a and building b, and electric unit heaters for localized heating, and exhaust fans for mechanical ventilation of building c. The system design adheres to current ashrae codes and 2015 imc. Electrical: the electrical system for this project will include incoming utility infrastructure, power distribution, all power connections to equipment and general use devices. Complete interior and exterior lighting and controls to comply with current ashrae energy codes shall be provided. Systems shall include fire alarm, data communications, and security.
Posted Date
Nov 19, 2025
Due Date
Dec 10, 2025
Release: Nov 19, 2025
Close: Dec 10, 2025
Demolishing three existing buildings in the rear of the high school to allow for three new free- standing buildings. One building consists of restrooms and concessions with the stadium spectators with two jv locker/restrooms. One building consists of two varsity locker rooms with a weight room. One building is a free-standing storage building for field equipment. Plumbing: the plumbing scope consists of upgrades to existing utility infrastructure for domestic water and natural gas services, and sanitary and storm sewer for buildings a and b. The systems are designed to meet the 2023 kentucky plumbing code. Buildings a and b each have a separate gas-fired water heater and recirculation pump system to serve all fixtures. Mechanical: the hvac system for the project consists of two (2) 100% outside air energy recovery units for heating, cooling and ventilation for both building a and building b, and electric unit heaters for localized heating, and exhaust fans for mechanical ventilation of building c. The system design adheres to current ashrae codes and 2015 imc. Electrical: the electrical system for this project will include incoming utility infrastructure, power distribution, all power connections to equipment and general use devices. Complete interior and exterior lighting and controls to comply with current ashrae energy codes shall be provided. Systems shall include fire alarm, data communications, and security.
Demolition of the existing fire alarm system and new install of the digital, addressable voice evacuation fire alarm system. The new fire alarm system shall be provided complete and operational to include infrastructure, equipment, wiring, devices, programming, etc. And be ready for use.
Posted Date
Nov 18, 2025
Due Date
Dec 9, 2025
Release: Nov 18, 2025
Close: Dec 9, 2025
Demolition of the existing fire alarm system and new install of the digital, addressable voice evacuation fire alarm system. The new fire alarm system shall be provided complete and operational to include infrastructure, equipment, wiring, devices, programming, etc. And be ready for use.
Hvac controls upgrades at cooper high school. Mechanical: the mechanical scope of work includes full replacement of all building automation system (BAS) components and software. New actuators for dampers and valves are being provided for heat recovery units, as well as variable frequency drives (VFDs) for fans via alternate no. 1. The new bas will be an open-license, open-protocol tridium n4 system utilizing vykon jaces installed throughout the building on mstp and ethernet trunks, as appropriate. Electrical: the electrical scope of work includes providing power and data to supplement mechanical scope of work.
Posted Date
Nov 18, 2025
Due Date
Dec 9, 2025
Release: Nov 18, 2025
Close: Dec 9, 2025
Hvac controls upgrades at cooper high school. Mechanical: the mechanical scope of work includes full replacement of all building automation system (BAS) components and software. New actuators for dampers and valves are being provided for heat recovery units, as well as variable frequency drives (VFDs) for fans via alternate no. 1. The new bas will be an open-license, open-protocol tridium n4 system utilizing vykon jaces installed throughout the building on mstp and ethernet trunks, as appropriate. Electrical: the electrical scope of work includes providing power and data to supplement mechanical scope of work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis