Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolishing three existing buildings in the rear of the high school to allow for three new free- standing buildings. One building consists of restrooms and concessions with the stadium spectators with two jv locker/restrooms. One building consists of two varsity locker rooms with a weight room. One building is a free-standing storage building for field equipment. Plumbing: the plumbing scope consists of upgrades to existing utility infrastructure for domestic water and natural gas services, and sanitary and storm sewer for buildings a and b. The systems are designed to meet the 2023 kentucky plumbing code. Buildings a and b each have a separate gas-fired water heater and recirculation pump system to serve all fixtures. Mechanical: the hvac system for the project consists of two (2) 100% outside air energy recovery units for heating, cooling and ventilation for both building a and building b, and electric unit heaters for localized heating, and exhaust fans for mechanical ventilation of building c. The system design adheres to current ashrae codes and 2015 imc. Electrical: the electrical system for this project will include incoming utility infrastructure, power distribution, all power connections to equipment and general use devices. Complete interior and exterior lighting and controls to comply with current ashrae energy codes shall be provided. Systems shall include fire alarm, data communications, and security.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the construction of a fieldhouse, athletic fields, and storage buildings at Paul M. Hodgson Vocational Technical High School. The project is a construction contract with an expected performance of 18 months.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close: Jan 7, 2026
This RFP is for the construction of a fieldhouse, athletic fields, and storage buildings at Paul M. Hodgson Vocational Technical High School. The project is a construction contract with an expected performance of 18 months.
AvailableThe New Castle County Vocational Technical School District is soliciting bids to construct a new fieldhouse, athletic fields, and storage buildings at Hodgson Vo-Tech High School, including demolition of existing structures and multiple trade contracts (sitework, concrete, structural steel, roofing). Bidders must provide bid security equal to 10% of the bid amount and comply with prevailing wage requirements and Delaware accessibility standards. A mandatory site visit and pre-bid meeting are scheduled (12/16/2025) and questions are due by 12/31/2025; the solicitation closes on 2026-01-07.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close: Jan 7, 2026
The New Castle County Vocational Technical School District is soliciting bids to construct a new fieldhouse, athletic fields, and storage buildings at Hodgson Vo-Tech High School, including demolition of existing structures and multiple trade contracts (sitework, concrete, structural steel, roofing). Bidders must provide bid security equal to 10% of the bid amount and comply with prevailing wage requirements and Delaware accessibility standards. A mandatory site visit and pre-bid meeting are scheduled (12/16/2025) and questions are due by 12/31/2025; the solicitation closes on 2026-01-07.
Invitation to bid for multiple prime trade construction contracts for the Hodgson Vo‑Tech High School fieldhouse, athletic fields, and storage buildings in Wilmington, DE. Solicitation covers many trade packages (e.g., demolition, sitework/utilities, concrete/reinforcing, structural steel, masonry, carpentry, exterior metal panels/pre-engineered buildings, roofing, doors/hardware, overhead doors, fluid-applied flooring, painting, bleachers/grandstands, fire protection, plumbing/HVAC/controls, electrical/lighting/fire alarm, special systems, final cleaning, general labor/clean-up, flagger/entrance protection). Requirements include a 10% bid security, 100% performance and payment bonds on award, a 7% DBE participation goal, prevailing wage and drug-testing/craft training compliance.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Athletic Trainer/Fieldhouse Equipment and Supplies.
Posted Date
Nov 26, 2025
Due Date
Feb 3, 2026
Release: Nov 26, 2025
Close: Feb 3, 2026
Athletic Trainer/Fieldhouse Equipment and Supplies.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 7, 2026
Invitation to bid for multiple prime trade construction contracts for the Hodgson Vo‑Tech High School fieldhouse, athletic fields, and storage buildings in Wilmington, DE. Solicitation covers many trade packages (e.g., demolition, sitework/utilities, concrete/reinforcing, structural steel, masonry, carpentry, exterior metal panels/pre-engineered buildings, roofing, doors/hardware, overhead doors, fluid-applied flooring, painting, bleachers/grandstands, fire protection, plumbing/HVAC/controls, electrical/lighting/fire alarm, special systems, final cleaning, general labor/clean-up, flagger/entrance protection). Requirements include a 10% bid security, 100% performance and payment bonds on award, a 7% DBE participation goal, prevailing wage and drug-testing/craft training compliance.