Discover Opportunities months before the RFP drops
Learn more →Project consists of recon- structing and widening road to three lanes a 7.5 pedestrian path will be constructed on both the north and and the relocation and burying of irrigation facilities. In addition, the bridge and the culvert will be replaced and constructed to a 5-lane section for future expansion. Work includes, 27,600 CY of excavation; 23,705 TON of granular subbase; 13,545 TON of 3/4" aggregate type B for base; 6,825 TON of superpave hma pavement including asphalt & additive class sp-3; 7,740 SY of sidewalk; 1,246 SF of anti-graffiti coating; 602 SY of concrete waterproof system type e; 516 CY of loose riprap; 258 SY of riprap/erosion control geotextile; 670 CY of geosynthetic reinforced abutment backfill; 152 SY of textured concrete surface.
Posted Date
Jul 19, 2025
Due Date
Aug 4, 2025
Release: Jul 19, 2025
Close: Aug 4, 2025
Project consists of recon- structing and widening road to three lanes a 7.5 pedestrian path will be constructed on both the north and and the relocation and burying of irrigation facilities. In addition, the bridge and the culvert will be replaced and constructed to a 5-lane section for future expansion. Work includes, 27,600 CY of excavation; 23,705 TON of granular subbase; 13,545 TON of 3/4" aggregate type B for base; 6,825 TON of superpave hma pavement including asphalt & additive class sp-3; 7,740 SY of sidewalk; 1,246 SF of anti-graffiti coating; 602 SY of concrete waterproof system type e; 516 CY of loose riprap; 258 SY of riprap/erosion control geotextile; 670 CY of geosynthetic reinforced abutment backfill; 152 SY of textured concrete surface.
Project consists of repairing a landslide on Bear Creek Road north of Calamity Campground near Palisades Reservoir. The project will consist of constructing a 280 LF Welded Wire Mechanically Stabilized Earth (MSE) retaining wall and a 215 LF Steepened Slope Repair at the landslide location. Repairs will generally consist of excavation, backfill, a welded wire MSE wall and Welded Wire Steepened Slope repair, new asphalt paved road section, guardrail, storm drainage, and a concrete roadside "V" ditch.
Posted Date
Jul 11, 2025
Due Date
Jul 28, 2025
Release: Jul 11, 2025
Close: Jul 28, 2025
Project consists of repairing a landslide on Bear Creek Road north of Calamity Campground near Palisades Reservoir. The project will consist of constructing a 280 LF Welded Wire Mechanically Stabilized Earth (MSE) retaining wall and a 215 LF Steepened Slope Repair at the landslide location. Repairs will generally consist of excavation, backfill, a welded wire MSE wall and Welded Wire Steepened Slope repair, new asphalt paved road section, guardrail, storm drainage, and a concrete roadside "V" ditch.
Provide and construct a fully operational turnkey fueling station for county vehicles and equipment.
Posted Date
Jul 19, 2024
Due Date
Aug 6, 2024
Release: Jul 19, 2024
Close: Aug 6, 2024
Provide and construct a fully operational turnkey fueling station for county vehicles and equipment.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis