Learn more →Major rehabilitation of the existing Plant 3 Headworks building, including screen rehabilitation, new screenings conveyance, new vortex grit collector, new grit slurry pump, and grit washer. Also, replacement and installation of 60-inch screw pumps at the Far West Sewer Pump Station, new HVAC, gas safety equipment, manual bar rack channel construction, and miscellaneous site work.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Major rehabilitation of the existing Plant 3 Headworks building, including screen rehabilitation, new screenings conveyance, new vortex grit collector, new grit slurry pump, and grit washer. Also, replacement and installation of 60-inch screw pumps at the Far West Sewer Pump Station, new HVAC, gas safety equipment, manual bar rack channel construction, and miscellaneous site work.
AvailableConstruction consists of: major rehabilitation of the existing plant 3 headworks building including: existing screen rehabilitation, new screenings conveyance and dewatering/compaction, a new vortex grit collector, new grit slurry pump and grit washer. Additionally, two 60" screw pumps will be replaced and one new 60" screw pump will be installed at the far west sewer pump station. New hvac will be provided for the plant 3 headworks buildings (screen room, washer-compactor room, electrical room, and grit washer room) and gas safety equipment will be installed in classified areas. A manual bar rack channel will be constructed. All existing slide gates will be removed and/or replaced. Miscellaneous site piping, grading, electrical, controls, architecture, mechanical, and plumbing work will be included.
Posted Date
Dec 2, 2025
Due Date
Jan 16, 2026
Release: Dec 2, 2025
Close: Jan 16, 2026
Construction consists of: major rehabilitation of the existing plant 3 headworks building including: existing screen rehabilitation, new screenings conveyance and dewatering/compaction, a new vortex grit collector, new grit slurry pump and grit washer. Additionally, two 60" screw pumps will be replaced and one new 60" screw pump will be installed at the far west sewer pump station. New hvac will be provided for the plant 3 headworks buildings (screen room, washer-compactor room, electrical room, and grit washer room) and gas safety equipment will be installed in classified areas. A manual bar rack channel will be constructed. All existing slide gates will be removed and/or replaced. Miscellaneous site piping, grading, electrical, controls, architecture, mechanical, and plumbing work will be included.
AvailableProject includes the televising and cleaning of multiple interceptor sewers that have heavy grit accumulation.
Posted Date
Dec 2, 2025
Due Date
Dec 19, 2025
Release: Dec 2, 2025
Close: Dec 19, 2025
Project includes the televising and cleaning of multiple interceptor sewers that have heavy grit accumulation.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis