Discover Opportunities months before the RFP drops
Learn more →Phase 1: Work of this Phase includes installation of approx 2,200 LF of 8" arctic high density polyethylene (HDPE) pipe to replace the existing 8" ductile iron pipe (DIP) water main in the Indian Creek Subdivision (ICS), new hydrant assemblies, replacement of twenty-four (24) copper water services with jacketed insulated PEX pipe services with buried curb stops. Services will include electrical heat trace and home electrical connections with new circuit breaker. Phase 2: Work of this Phase includes installation of approx 1,800 LF of 8" arctic HDPE transmission main from the ICS to Lower Village distribution main, installing new pressure pumps, pipe connections, pressure switches and control panel in the water treatment plant.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Phase 1: Work of this Phase includes installation of approx 2,200 LF of 8" arctic high density polyethylene (HDPE) pipe to replace the existing 8" ductile iron pipe (DIP) water main in the Indian Creek Subdivision (ICS), new hydrant assemblies, replacement of twenty-four (24) copper water services with jacketed insulated PEX pipe services with buried curb stops. Services will include electrical heat trace and home electrical connections with new circuit breaker. Phase 2: Work of this Phase includes installation of approx 1,800 LF of 8" arctic HDPE transmission main from the ICS to Lower Village distribution main, installing new pressure pumps, pipe connections, pressure switches and control panel in the water treatment plant.
AvailableProvide services for multi-community sanitation backup generators project.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Provide services for multi-community sanitation backup generators project.
AvailableThe projects includes to Raw Water Intake Improvements Project- Construct a raw water intake and raw water transmission line, and replace existing utilidor junction boxes, Raw Water Intake Improvements Project- Construct a raw water intake and raw water transmission line, and replace existing utilidor junction boxes.
Posted Date
Nov 5, 2025
Due Date
Dec 11, 2025
Release: Nov 5, 2025
Close: Dec 11, 2025
The projects includes to Raw Water Intake Improvements Project- Construct a raw water intake and raw water transmission line, and replace existing utilidor junction boxes, Raw Water Intake Improvements Project- Construct a raw water intake and raw water transmission line, and replace existing utilidor junction boxes.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis