Discover Opportunities months before the RFP drops
Learn more →Inspection services for equipment used for testing highway construction materials (i.e. soils, aggregates, asphalt, concrete); checking, standardizing, calibrating and/or verifying equipment used in mobile laboratories (trailers).
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Inspection services for equipment used for testing highway construction materials (i.e. soils, aggregates, asphalt, concrete); checking, standardizing, calibrating and/or verifying equipment used in mobile laboratories (trailers).
AvailableThis project is to rehabilitate and repair auto tour route. Drainage improvements from 15+75 to 89+50 including spot culvert and/or end section replacement, culvert cleaning, ditch excavation, ditch reconditioning, spot sub excavation, and roadway excavation. Decades of grading the gravel surface has created a berm along the roadway cutting off surface drainage to most of the existing ditches. Aggregate surfacing from 15+75 to 60+00. Aggregate surfacing from 60+00 to 89+50. Drainage improvements and Aggregate Surfacing from 89+50.
Posted Date
Nov 10, 2025
Due Date
Dec 11, 2025
Release: Nov 10, 2025
Close: Dec 11, 2025
This project is to rehabilitate and repair auto tour route. Drainage improvements from 15+75 to 89+50 including spot culvert and/or end section replacement, culvert cleaning, ditch excavation, ditch reconditioning, spot sub excavation, and roadway excavation. Decades of grading the gravel surface has created a berm along the roadway cutting off surface drainage to most of the existing ditches. Aggregate surfacing from 15+75 to 60+00. Aggregate surfacing from 60+00 to 89+50. Drainage improvements and Aggregate Surfacing from 89+50.
Red grade road, phase 1. The proposed roadway will vary from 22-foot wide to 18-foot total. The existing roadway width is 18 feet wide. The project will include minor horizontal and vertical realignments to improve sight distance and roadway geometry, as well as drainage improvements to obtain a design standard for the proposed roadway. The project is considered 3R+ and located in mountainous terrain.
Posted Date
Nov 6, 2025
Due Date
Dec 1, 2025
Release: Nov 6, 2025
Close: Dec 1, 2025
Red grade road, phase 1. The proposed roadway will vary from 22-foot wide to 18-foot total. The existing roadway width is 18 feet wide. The project will include minor horizontal and vertical realignments to improve sight distance and roadway geometry, as well as drainage improvements to obtain a design standard for the proposed roadway. The project is considered 3R+ and located in mountainous terrain.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis