Discover Opportunities months before the RFP drops
Learn more →The track work shall include: Platform removals, including removal and disposal of all pressure treated wooden sleepers, composite deck boards, and associated hardware. Removal and disposal of existing wooden fence at Mack Plaza Station. Ballast replacement (existing ballast shall be removed and properly disposed of). Cross tie replacement (existing damaged/unusable railway ties shall be removed and properly disposed of). Repair or replace existing electrical rail bonding straps per American Railway Engineering and Maintenance-of-Way Association (AREMA) Manual for Railway Engineering (AREMA Manual), Chapter 33, Part 8.1.30. Install new replacement platforms using pressure treated wooden deck sleepers, structural composite deck boards (or concrete slabs in specific identified areas), and hardware. See attached file.
Posted Date
Nov 20, 2025
Due Date
Dec 15, 2025
Release: Nov 20, 2025
Close: Dec 15, 2025
The track work shall include: Platform removals, including removal and disposal of all pressure treated wooden sleepers, composite deck boards, and associated hardware. Removal and disposal of existing wooden fence at Mack Plaza Station. Ballast replacement (existing ballast shall be removed and properly disposed of). Cross tie replacement (existing damaged/unusable railway ties shall be removed and properly disposed of). Repair or replace existing electrical rail bonding straps per American Railway Engineering and Maintenance-of-Way Association (AREMA) Manual for Railway Engineering (AREMA Manual), Chapter 33, Part 8.1.30. Install new replacement platforms using pressure treated wooden deck sleepers, structural composite deck boards (or concrete slabs in specific identified areas), and hardware. See attached file.
AvailableDevelopment requires an extremely accurate, “gold standard” set of gate-to-gate aircraft trajectory and other related aviation data for various testing activities including verification and validation (V&V) assessments.
Posted Date
Nov 18, 2025
Due Date
Nov 19, 2025
Release: Nov 18, 2025
Close: Nov 19, 2025
Development requires an extremely accurate, “gold standard” set of gate-to-gate aircraft trajectory and other related aviation data for various testing activities including verification and validation (V&V) assessments.
Please provide information separately for these two scenarios: Modifying the dunnage bar length while retaining and reusing the existing wood components: Feasibility of cutting/shortening the bar and the current wood pieces without compromising strength or fit. Required wood treatment or repair for reinstallation. Risks related to wood integrity during/after modification. See attached file.
Posted Date
Oct 29, 2025
Due Date
Nov 14, 2025
Release: Oct 29, 2025
Close: Nov 14, 2025
Please provide information separately for these two scenarios: Modifying the dunnage bar length while retaining and reusing the existing wood components: Feasibility of cutting/shortening the bar and the current wood pieces without compromising strength or fit. Required wood treatment or repair for reinstallation. Risks related to wood integrity during/after modification. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis