Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
NES integrity hotline services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
New Milford Public Schools is seeking qualified engineering firms to provide professional services for the design and installation of new code-compliant fire hydrants at Northville Elementary School. The work must comply with local, state, and national fire codes and local water utility standards and includes design and installation to ensure adequate exterior fire protection coverage on school grounds.
Posted Date
Oct 15, 2025
Due Date
Dec 15, 2025
Release: Oct 15, 2025
Close: Dec 15, 2025
New Milford Public Schools is seeking qualified engineering firms to provide professional services for the design and installation of new code-compliant fire hydrants at Northville Elementary School. The work must comply with local, state, and national fire codes and local water utility standards and includes design and installation to ensure adequate exterior fire protection coverage on school grounds.
Premium
Access the largest public sector contact database
Conducted to identify potential sources that may possess the expertise, capabilities, and experience to provide continual engineering support to the current aircraft structural integrity program (asip), mechanical equipment and subsystems integrity program (mecsip), avionics integrity program (avip), and electrical wiring interconnect system (ewis) for the helicopter program office (hpo) hh-60w, mh-139a, th-1h, and uh-1n weapon system.
Posted Date
Nov 20, 2025
Due Date
Jan 9, 2026
Release: Nov 20, 2025
Close: Jan 9, 2026
Conducted to identify potential sources that may possess the expertise, capabilities, and experience to provide continual engineering support to the current aircraft structural integrity program (asip), mechanical equipment and subsystems integrity program (mecsip), avionics integrity program (avip), and electrical wiring interconnect system (ewis) for the helicopter program office (hpo) hh-60w, mh-139a, th-1h, and uh-1n weapon system.
AvailableOpen source software: BlackBear: advanced simulation for structural integrity.
Posted Date
Mar 15, 2024
Due Date
Mar 15, 2026
Release: Mar 15, 2024
Close: Mar 15, 2026
Open source software: BlackBear: advanced simulation for structural integrity.
AvailableMechanical integrity testing (MIT) of existing deep injection wells IW-1 and IW-2. Testing includes downhole video surveys, pressure testing, high-resolution temperature logging, and radioactive tracer surveying in the 3,500-foot-deep injection wells. In addition, the Contractor shall replace the existing effluent flowmeter with Owner-furnished flowmeters.
Posted Date
Nov 26, 2025
Due Date
Jan 6, 2026
Release: Nov 26, 2025
Close: Jan 6, 2026
Mechanical integrity testing (MIT) of existing deep injection wells IW-1 and IW-2. Testing includes downhole video surveys, pressure testing, high-resolution temperature logging, and radioactive tracer surveying in the 3,500-foot-deep injection wells. In addition, the Contractor shall replace the existing effluent flowmeter with Owner-furnished flowmeters.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis