Retrieving RFP details
Release
Close
Santo Domingo Pueblo Library
The Work involves constructing Project B of the Wastewater Treatment Plant and Site Improvements. Project B; construct Entrance Works Facility, including cast-inplace concrete channel structures equipped with cylindrical fine screen, manual bypass screen, Parshall flume, open channel isolation gates, down-opening weir gates, dual gravity grit channels, ventilation system equipped with biofilter for odor control. Entrance Works Building: CMU building with wood truss roof building, approx. 91’ x 21’ W x 17’ parapet height. Primary Lift Station: Install three 25 HP influent pumps in wet well, check valves and isolation valves in valve vault, jib crane, and controls equipment with variable frequency drives; construct new yard piping throughout the Project B.
Santo Domingo Pueblo Library
The project includes but is not limited to Construction Administration and observation services for the Waste Water Treatment Plant (WWTP) Project B - Entrance Works Facility and Primary Lift Station.
City of Gulf Breeze
Project consists of applying a cementitious coating to the wet well's interior, replacing three existing pumps, base elbows, and all internal piping and appurtenances. Furthermore, it involves demolishing the current valve vault, installing new piping and valvesabove grade, and constructing a temporary bypass pump-out at the lift station site. The electrical scope includes installing a magnetic flow meter and pressure transducer andreplacing the lift station telemetry and control panels to accommodate the new lift station submersible pumps, operated via variable frequency drives (vfds).
City of Hallandale Beach
The work to be performed includes site, civil, mechanical, structural and electrical work associated with the Lift Station # 9 Rehabilitation Project . This project consists of the removal of two existing sanitary sewer pumps, associated piping, valves, fittings, supports, and electrical items including the existing diesel generator from the existing lift station, removal and replacement of the existing wet well top and valve vault, installation of a new meter vault, flow meter and three new submersible wastewater pumps along with the associated piping, valves, fittings, supports, electrical items including a variable frequency drive, reconnecting the new piping to the force main, installation of a new diesel generator, drum scrubber, driveway, fence
Release
Nov 02, 2025
Close
Dec 11, 2025