The work to be performed includes site, civil, mechanical, structural and electrical work associated with the Lift Station # 9 Rehabilitation Project . This project consists of the removal of two existing sanitary sewer pumps, associated piping, valves, fittings, supports, and electrical items including the existing diesel generator from the existing lift station, removal and replacement of the existing wet well top and valve vault, installation of a new meter vault, flow meter and three new submersible wastewater pumps along with the associated piping, valves, fittings, supports, electrical items including a variable frequency drive, reconnecting the new piping to the force main, installation of a new diesel generator, drum scrubber, driveway, fence
City of Hallandale Beach
Work includes to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system, rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, scada, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project.
City of Gulf Breeze
Project consists of applying a cementitious coating to the wet well's interior, replacing three existing pumps, base elbows, and all internal piping and appurtenances. Furthermore, it involves demolishing the current valve vault, installing new piping and valvesabove grade, and constructing a temporary bypass pump-out at the lift station site. The electrical scope includes installing a magnetic flow meter and pressure transducer andreplacing the lift station telemetry and control panels to accommodate the new lift station submersible pumps, operated via variable frequency drives (vfds).
City of Gulf Breeze
Work consists of applying a cementitious coating to the wet well's interior, replacing three existing pumps, base elbows, and all internal piping and appurtenances, demolishing the current valve vault, installing new piping and valves above grade, and constructing a temporary bypass pump-out at the lift station site, the electrical scope includes installing a magnetic flow meter and pressure transducer andreplacing the lift station telemetry and control panels to accommodate the new lift stationsubmersible pumps, operated via variable frequency drives (vfds).