Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New York State Department of Transportation
Provide services for Work Zone Traffic Control (WZTC) and access equipment and timber planking removal and reinstallation. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of San Bernardino
Work consists of constructing a raised median island, include survey, clearing and grubbing, removals, excavation, grading, construction of PCC curbs, gutters, sidewalks and concrete structures; installation of storm drain pipes, catch basins, and drainage appurtenances; cold milling, pavement reconstruction, asphalt overlays with reinforcing fibers, and pavement restoration; signing, striping, and replacement of traffic signal loop detectors; implementation of erosion control plan & BMPs and traffic control measures; installation of removable bollards and grouted river rock median surfacing; and all other incidental work
Posted Date
Nov 17, 2025
Due Date
Dec 15, 2025
Release: Nov 17, 2025
City of San Bernardino
Close: Dec 15, 2025
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Work consists of constructing a raised median island, include survey, clearing and grubbing, removals, excavation, grading, construction of PCC curbs, gutters, sidewalks and concrete structures; installation of storm drain pipes, catch basins, and drainage appurtenances; cold milling, pavement reconstruction, asphalt overlays with reinforcing fibers, and pavement restoration; signing, striping, and replacement of traffic signal loop detectors; implementation of erosion control plan & BMPs and traffic control measures; installation of removable bollards and grouted river rock median surfacing; and all other incidental work
City of San Bernardino
Work consists of constructing a raised median island, include survey, clearing and grubbing, removals, excavation, grading, construction of PCC curbs, gutters, sidewalks and concrete structures; installation of storm drain pipes, catch basins, and drainage appurtenances; cold milling, pavement reconstruction, asphalt overlays with reinforcing fibers, and pavement restoration; signing, striping, and replacement of traffic signal loop detectors; implementation of erosion control plan & BMPs and traffic control measures; installation of removable bollards and grouted river rock median surfacing; and all other incidental work
Posted Date
Nov 17, 2025
Due Date
Dec 15, 2025
Release: Nov 17, 2025
City of San Bernardino
Close: Dec 15, 2025
Work consists of constructing a raised median island, include survey, clearing and grubbing, removals, excavation, grading, construction of PCC curbs, gutters, sidewalks and concrete structures; installation of storm drain pipes, catch basins, and drainage appurtenances; cold milling, pavement reconstruction, asphalt overlays with reinforcing fibers, and pavement restoration; signing, striping, and replacement of traffic signal loop detectors; implementation of erosion control plan & BMPs and traffic control measures; installation of removable bollards and grouted river rock median surfacing; and all other incidental work
AvailableCity of Santa Paula
Provide solar-powered street lighting poles and fixtures. Bid must include a lighting diagram for the 1260' x 45' road segment to demonstrate placement of fixtures and coverage.
Posted Date
Nov 18, 2025
Due Date
Dec 11, 2025
Release: Nov 18, 2025
City of Santa Paula
Close: Dec 11, 2025
Provide solar-powered street lighting poles and fixtures. Bid must include a lighting diagram for the 1260' x 45' road segment to demonstrate placement of fixtures and coverage.
AvailableCity of Riverside
The City of Riverside seeks contractors to remove and replace the existing gravity sewer along Third Street between Market Street and Vine Street to upgrade sewer capacity for anticipated future flows. Questions and clarifications must be submitted via the Citys electronic bidding system (PlanetBids) Q&A tab; documents are provided through PlanetBids.
Posted Date
-
Due Date
Dec 22, 2025
City of Riverside
Close: Dec 22, 2025
The City of Riverside seeks contractors to remove and replace the existing gravity sewer along Third Street between Market Street and Vine Street to upgrade sewer capacity for anticipated future flows. Questions and clarifications must be submitted via the Citys electronic bidding system (PlanetBids) Q&A tab; documents are provided through PlanetBids.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →