Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Waltham
Woerd avenue landfill revitalization project, 2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Waltham
Woerd Ave Landfill Revitalization Project, 2025
Posted Date
Nov 5, 2025
Due Date
Dec 2, 2025
Release: Nov 5, 2025
City of Waltham
Close: Dec 2, 2025
Woerd Ave Landfill Revitalization Project, 2025
AvailableCity of Rochester
Project includes the revitalization. Work consists of but is not limited to: demolition; grading; sidewalk and trail construction; drainage improvements; retaining walls; and park amenities including lighting, seating, and landscaping. See outside link.
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
City of Rochester
Close: Dec 9, 2025
Project includes the revitalization. Work consists of but is not limited to: demolition; grading; sidewalk and trail construction; drainage improvements; retaining walls; and park amenities including lighting, seating, and landscaping. See outside link.
AvailableCity of Algoma
The work consist of approx 2,600 LF 30" concrete curb and gutter; 6,900 SY complete unclassified excavation earthwork; 2,200 LF complete landscaping topsoil, fertilize, seed and mulch; 3 LF 10" PVC water main pipe; 675 LF 10" PVC sanitary sewer pipe; 275 LF 24" reinforced concrete class IV storm sewer pipe.
Posted Date
Nov 11, 2025
Due Date
Nov 25, 2025
Release: Nov 11, 2025
City of Algoma
Close: Nov 25, 2025
The work consist of approx 2,600 LF 30" concrete curb and gutter; 6,900 SY complete unclassified excavation earthwork; 2,200 LF complete landscaping topsoil, fertilize, seed and mulch; 3 LF 10" PVC water main pipe; 675 LF 10" PVC sanitary sewer pipe; 275 LF 24" reinforced concrete class IV storm sewer pipe.
AvailableCity of Carnation
Landfill pond maintenance project. Improvements shall include to grading plan, HDPE geomembrane liner, geotextile filter fabrics, gravel backfill for drains, quarry spalls, temporary erosion control, temporary traffic control, hydroseed restoration and other work.
Posted Date
Nov 10, 2025
Due Date
Nov 24, 2025
Release: Nov 10, 2025
City of Carnation
Close: Nov 24, 2025
Landfill pond maintenance project. Improvements shall include to grading plan, HDPE geomembrane liner, geotextile filter fabrics, gravel backfill for drains, quarry spalls, temporary erosion control, temporary traffic control, hydroseed restoration and other work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis