Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of labor, materials, equipment, and specialized skills for the installation and repair of ADA compliant curb ramps and sidewalks. This includes selective removal and replacement of deteriorated Portland cement concrete pavement, grading, subgrade preparation, and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, alley aprons, and curb drains.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Selective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons.
Posted Date
Dec 15, 2025
Due Date
Jan 14, 2026
Release: Dec 15, 2025
Close: Jan 14, 2026
Selective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons.
AvailableSelective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons.
Posted Date
Dec 15, 2025
Due Date
Jan 14, 2026
Release: Dec 15, 2025
Close: Jan 14, 2026
Selective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons.
AvailableRemoval and replacement of curb, gutter, sidewalk, ada ramps.
Posted Date
Dec 13, 2025
Due Date
Jan 8, 2026
Release: Dec 13, 2025
Close: Jan 8, 2026
Removal and replacement of curb, gutter, sidewalk, ada ramps.
AvailableThis is a Design-Bid-Build construction solicitation to remediate pedestrian facilities at seven Access Request sites and bring them into compliance with ADA standards. Scope includes sidewalk/driveway/curb/gutter replacement, curb ramp installation, asphalt patching, tree work, utility box adjustments, and reinstallation of water meters and pedestrian infrastructure. The bid package is hosted only on RAMPLA (download and register as a planholder) and a pre-bid meeting is scheduled via Google Meet.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
This is a Design-Bid-Build construction solicitation to remediate pedestrian facilities at seven Access Request sites and bring them into compliance with ADA standards. Scope includes sidewalk/driveway/curb/gutter replacement, curb ramp installation, asphalt patching, tree work, utility box adjustments, and reinstallation of water meters and pedestrian infrastructure. The bid package is hosted only on RAMPLA (download and register as a planholder) and a pre-bid meeting is scheduled via Google Meet.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis