County of St. Louis
Work consists of removal and replacement of deteriorated and/or damaged pavement and curbs, surfacing and texturing, superpave asphaltic concrete overlay, removal and replacement of sidewalk and curb ramps, removal and replacement of modular block wall, installation of accessible pedestrian signals. And other incidental items
City of Hialeah
Work includes 4,105 LF sediment barrier; 16 EA inlet protection system; 1 LS selective clearing and grubbing, areas with trees to remain; 152. 3 CY regular excavation; 28 SY type b stabilization; 10,546. 4 SY milling exist asph pavt, 1" avg depth; 857.1 TN superpave asphaltic concrete (overbuild + 1. 5" resurfacing); 89 ton miscellaneous asphalt pavement; 3 EA inlets, curb, type p-3, <10'; 14 EA inlets, curb, type p-4, <10'; 7 EA manhole, adjust, utilities; 16 EA valve boxes, adjust; 40 LF 24" pipe culvert (storm sewer); 853 LF french drain, 24"; 500 LF pipe handrail - guiderail, aluminum'; 3,715 LF concrete curb and gutter type "f"; 425 LF concrete curb and gutter type "e". See outside link.
Illinois Department of Transportation
Work includes 3 ea. 30" x 6" PVC sewer service connections; 4 EA. 15" x 6" PVC sewer service connections; 40' PVC combined sewer pipe replacement 15"; 140' PVC combined sewer pipe replacement 12"; 15 EA. 12" x 6" PVC sewer service connections; 120' sanitary sewer service 6"; 2 EA. Maintenance of existing flashing beacon installation; 24,000 SY hot-mix asphalt surface removal, variable depth; 9,600' thermoplastic pavement marking - line 4"; 375' thermoplastic pavement marking - line 24"; 275' combination concrete curb and gutter, type B-6.12.
Illinois Department of Transportation
Work includes 13 EA. Water service install, 1" complete; 1 EA. Water service install, 2" complete; 1 EA. Pressure connection; 45' storm sewer (water main requirements) 8"; 145' storm sewer (water main requirements) 10"; 325' storm sewer (water main requirements) 12"; 60' storm sewer (water main requirements) 15"; 105' storm sewer (water main requirements) 18"; 1 EA. Manholes, type a, 10'-dia, type 1 frame, closed lid; 4 EA. Plug water main 4"; 10 EA. Plug water main 8"; 200 LF cured-in-place pipe liner, 18".