Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide a permanent irrigation system to water trees. The permanent PVC irrigation line will need to be attached to the existing line setup and run along both sides of the main thoroughfare of the site to an area running parallel to the road, as well as around the office and visitors' facilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Cemetery - irrigation pump station. Approx. 670 LF of furnish and install 12" C900 PVC waterline (open cut); 91 LF furnish and install 12" C900 PVC waterline (slick bore); furnish and install prefabricated metal building, foundation and appurtenances; Furnish and Install Vertical Turbine Pump;
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Cemetery - irrigation pump station. Approx. 670 LF of furnish and install 12" C900 PVC waterline (open cut); 91 LF furnish and install 12" C900 PVC waterline (slick bore); furnish and install prefabricated metal building, foundation and appurtenances; Furnish and Install Vertical Turbine Pump;
AvailablePremium
Access the largest public sector contact database
Irrigation Pump Station Installation.
Posted Date
Nov 26, 2025
Due Date
Dec 11, 2025
Release: Nov 26, 2025
Close: Dec 11, 2025
Irrigation Pump Station Installation.
The U.S. Department of Veterans Affairs is soliciting irrigation services at Fort Snelling National Cemetery to maintain the cemetery grounds and ensure the irrigation system functions properly. This Request for Quotation (QSE--36C78626Q50027) is published on SAM.gov and is currently active, with a published date of 2025-12-04 and an offer due date of 2025-12-19. The notice lists Olalekan Ismail as the contracting officer contact and indicates an SDVOSB set-aside classification.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
The U.S. Department of Veterans Affairs is soliciting irrigation services at Fort Snelling National Cemetery to maintain the cemetery grounds and ensure the irrigation system functions properly. This Request for Quotation (QSE--36C78626Q50027) is published on SAM.gov and is currently active, with a published date of 2025-12-04 and an offer due date of 2025-12-19. The notice lists Olalekan Ismail as the contracting officer contact and indicates an SDVOSB set-aside classification.
AvailableWork includes irrigation central control installation. Provide active watering of the irrigation system at all times during the irrigation project, label all existing irrigation wires in the existing controller with current station number, record existing irrigation controller programming for later use, removal and disposal of existing irrigation controller and existing irrigation equipment, clean and seal/waterproof existing controller enclosures, furnish and install new smart irrigation controller assembly into existing controller enclosure, ground controller, wire new smart irrigation controller assembly to existing electrical in existing controller enclosure. Electrical wires and connections to be in flexible conduit and junction boxes.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Close: Dec 16, 2025
Work includes irrigation central control installation. Provide active watering of the irrigation system at all times during the irrigation project, label all existing irrigation wires in the existing controller with current station number, record existing irrigation controller programming for later use, removal and disposal of existing irrigation controller and existing irrigation equipment, clean and seal/waterproof existing controller enclosures, furnish and install new smart irrigation controller assembly into existing controller enclosure, ground controller, wire new smart irrigation controller assembly to existing electrical in existing controller enclosure. Electrical wires and connections to be in flexible conduit and junction boxes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis