Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Fairhope
Provide all material, equipment, labor, and incidentals required for: removal of suction tubing in the well; mechanical cleaning of the well screen; testing the well after cleaning; videos of the well prior to and after cleaning; determining the appropriate pump size and intake elevation based on testing results and existing conditions; replacement of the existing pump; disinfection of the new or repaired pump and well; providing a temporary pump; and performing a water quality test.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Branson
Provide for the removal and installation of one groundwater well pump assembly from City Well #3, including the submersible pump and motor, power cable, piping, air tubing, collars, check valves, bands, and all related pump assembly components.
Posted Date
Oct 23, 2025
Due Date
Nov 24, 2025
Release: Oct 23, 2025
City of Branson
Close: Nov 24, 2025
Provide for the removal and installation of one groundwater well pump assembly from City Well #3, including the submersible pump and motor, power cable, piping, air tubing, collars, check valves, bands, and all related pump assembly components.
AvailableCity of Branson
Provide for the removal, inspection, installation, and lowering of one groundwater well pump assembly from City Well #12, including the submersible pump and motor, power cable, piping, air tubing, collars, check valves, bands, and all related pump assembly components.
Posted Date
Oct 23, 2025
Due Date
Nov 24, 2025
Release: Oct 23, 2025
City of Branson
Close: Nov 24, 2025
Provide for the removal, inspection, installation, and lowering of one groundwater well pump assembly from City Well #12, including the submersible pump and motor, power cable, piping, air tubing, collars, check valves, bands, and all related pump assembly components.
AvailableHarris County Wcid 158
Furnish and install all necessary materials for a complete, fully automatic, and reliable pumping system for proposed Irrigation Pump Station No. 8 with makeup well. Work includes but is not limited to intake piping, concrete slab, pumping station, irrigation piping, pump house structure, overflow structure, makeup well, access driveway, on-site paving, site work, and electrical/instrumentation/controls. Work shall include all startup and commissioning for a complete pump station. Complete in Place.
Posted Date
Nov 14, 2025
Due Date
Dec 10, 2025
Release: Nov 14, 2025
Harris County Wcid 158
Close: Dec 10, 2025
Furnish and install all necessary materials for a complete, fully automatic, and reliable pumping system for proposed Irrigation Pump Station No. 8 with makeup well. Work includes but is not limited to intake piping, concrete slab, pumping station, irrigation piping, pump house structure, overflow structure, makeup well, access driveway, on-site paving, site work, and electrical/instrumentation/controls. Work shall include all startup and commissioning for a complete pump station. Complete in Place.
Kent County
Replace and abandon existing Well #2 by constructing a new well adjacent to it, to be named Well #4. Work also includes a new well pump, minor site work, minor pipe work, a replacement motor starter, and electrical work associated with the new well pump.
Posted Date
Oct 21, 2025
Due Date
Nov 24, 2025
Release: Oct 21, 2025
Kent County
Close: Nov 24, 2025
Replace and abandon existing Well #2 by constructing a new well adjacent to it, to be named Well #4. Work also includes a new well pump, minor site work, minor pipe work, a replacement motor starter, and electrical work associated with the new well pump.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis