Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Preble County
Project includes the following work: the replacement of water main, new water services, meter pits, and fire hydrants will be installed as well.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Meade County Water District
Meade County Water District is soliciting bids for the KY 1638 Transmission Main Improvements Phase 1 project in Brandenburg, Kentucky, with documents distributed via Lynn Imaging. Bids are due December 18, 2025 at 11:00 AM ET; a pre‑bid meeting is listed for December 2, 2025 at 10:00 AM ET.
Posted Date
-
Due Date
Dec 18, 2025
Meade County Water District
Close: Dec 18, 2025
Meade County Water District is soliciting bids for the KY 1638 Transmission Main Improvements Phase 1 project in Brandenburg, Kentucky, with documents distributed via Lynn Imaging. Bids are due December 18, 2025 at 11:00 AM ET; a pre‑bid meeting is listed for December 2, 2025 at 10:00 AM ET.
AvailableWalton County Water & Sewerage Authority
Work includes construction of approx 20,000 LF of 36" and 30" ductile iron pipe water main, 120' of 42" steel cased jack and bore, 30 gate valves ranging in size from 6" to 36", six air release valve assemblies, 18 fire hydrants and connection to the water main leaving the new water treatment plant complete in place, pressure tested and disinfected, ready to operate, and any additional associated work.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Walton County Water & Sewerage Authority
Close: Dec 18, 2025
Work includes construction of approx 20,000 LF of 36" and 30" ductile iron pipe water main, 120' of 42" steel cased jack and bore, 30 gate valves ranging in size from 6" to 36", six air release valve assemblies, 18 fire hydrants and connection to the water main leaving the new water treatment plant complete in place, pressure tested and disinfected, ready to operate, and any additional associated work.
AvailableCity of North Chicago
Construction of 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional drilling construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
City of North Chicago
Close: Jan 9, 2026
Construction of 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional drilling construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection.
AvailableCity of North Chicago
Construction of 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional drilling construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
City of North Chicago
Close: Jan 9, 2026
Construction of 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional drilling construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis