Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The proposed project generally includes the conversion of the outer ring of the existing aeration basin treatment tank to a flow equalization basin and influent pump station; conversion of existing clarifier to sludge storage, installation of two (2) non-potable water pumps; installation of three (3) owner furnished 12,000 gallon sludge storage tanks and one (1) owner furnished 8,500 gallon sludge storage tank; Installation of two (2) owner furnished sludge pumps and a prefabricated building; installation of two (2) Owner furnished modular membrane bioreactor (MBR) units, each rated to treat 0.075 MGD of wastewater. Included in the modular MBR units are the following subsystems: fine screen and screenings chute; influent flow meter; handrails; chemical drum connections; stairs; offboard piping; CIP vent; UV disinfection units; membrane units. Contractors are to coordinate with the Modular Membrane supplier, Integrated Water Services (IWS), to ensure proper transport and installation procedures are followed. A CABC pad is to be installed supporting the MBR units, electrical building, and sludge storage containers. All necessary piping, electrical wiring, controls, and sitework are included in the project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableConstruction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableProvide construction of wastewater treatment plant office.
Posted Date
Nov 16, 2025
Due Date
Jan 14, 2026
Release: Nov 16, 2025
Close: Jan 14, 2026
Provide construction of wastewater treatment plant office.
AvailableThe City of Abbeville, SC is soliciting proposals for a Water Treatment Plant Upgrade project to upgrade its existing water treatment plant. The RFP includes contact information for the project coordinator and directs respondents to the bid source for full documentation. Proposals are due January 9, 2026 at 10:00 AM.
Posted Date
Dec 16, 2025
Due Date
Jan 9, 2026
Release: Dec 16, 2025
Close: Jan 9, 2026
The City of Abbeville, SC is soliciting proposals for a Water Treatment Plant Upgrade project to upgrade its existing water treatment plant. The RFP includes contact information for the project coordinator and directs respondents to the bid source for full documentation. Proposals are due January 9, 2026 at 10:00 AM.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis