Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wastewater treatment plant grit/screenings disposal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
Posted Date
Oct 31, 2025
Due Date
Dec 19, 2025
Release: Oct 31, 2025
Close: Dec 19, 2025
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
Premium
Access the largest public sector contact database
Construction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableConstruction of wastewater treatment plant expansion.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Construction of wastewater treatment plant expansion.
AvailableConstruction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
Posted Date
Dec 5, 2025
Due Date
Feb 19, 2026
Release: Dec 5, 2025
Close: Feb 19, 2026
Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis