Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of replacing approx 12,000 LF of 8 and 350 LF of 12 pvc gravity sewer mains along with 60 manholes, 110 replacement sewer services and road restoration. There are also upgrades to generators and scada systems at three existing lift stations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Provide wastewater system improvements that also includes 1 LS erosion control; 1 LS bypass pumping and temporary treatment during wastewater treatment facility improvements; 1 LS site earthwork and final grading. Includes grading for UV, operations building and associated piping; 1 LS gravel pavement. See outside link.
Premium
Access the largest public sector contact database
Work includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
Posted Date
Dec 4, 2025
Due Date
Jan 7, 2026
Release: Dec 4, 2025
Close: Jan 7, 2026
Work includes comprehensive improvements to the lift station, the wastewater treatment plant (wwtp), and the sanitary sewer system. At the lift station, work will involve installing a new level transducer with associated electrical and controls, replacing the control panel, and adding a permanent natural gas generator with an automatic transfer switch. Additional upgrades include the installation of bollards, a new submersible pump, a precast concrete top on the wet well with a new access hatch and fall protection, and a davit crane for safe equipment handling. At the wwtp, the scope includes removing existing chlorine disinfection equipment, making minor structural modifications, and installing a new ultraviolet disinfection system.
AvailableProvide 2026 phase ii capital improvements.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
Close: Dec 23, 2025
Provide 2026 phase ii capital improvements.
AvailableConstruction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis