Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Elmwood Place
Street Parking Lot.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Golden
The City of Golden, Colorado is seeking bids for the Grampsas Park Parking Lot & Salvia Street project to improve access, safety, and functionality of Tony Grampsas Memorial Park, including pavement, sidewalks, drainage, lighting, and landscaping. The project includes a Base Bid for parking lot improvements and an Alternate Bid for Salvia Street enhancements, and requires standard bonding, permitting, and contractual obligations.
Posted Date
-
Due Date
Dec 13, 2025
City of Golden
Close: Dec 13, 2025
The City of Golden, Colorado is seeking bids for the Grampsas Park Parking Lot & Salvia Street project to improve access, safety, and functionality of Tony Grampsas Memorial Park, including pavement, sidewalks, drainage, lighting, and landscaping. The project includes a Base Bid for parking lot improvements and an Alternate Bid for Salvia Street enhancements, and requires standard bonding, permitting, and contractual obligations.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Lexington-Fayette Urban County Government
East vine street wall replacement.
Posted Date
Dec 10, 2025
Due Date
Jan 7, 2026
Release: Dec 10, 2025
Lexington-Fayette Urban County Government
Close: Jan 7, 2026
East vine street wall replacement.
AvailableIllinois Department of Transportation
The Illinois Department of Transportation is seeking bids for the construction of a hot-mix asphalt parking lot with access from North State Street in Belvidere, Boone County. The project includes a lighted sidewalk and riverfront shore stabilization. Bids are scheduled to be received as part of the January 16, 2026 letting at 12:00 PM Central Time.
Posted Date
Nov 25, 2025
Due Date
Jan 16, 2026
Release: Nov 25, 2025
Illinois Department of Transportation
Close: Jan 16, 2026
The Illinois Department of Transportation is seeking bids for the construction of a hot-mix asphalt parking lot with access from North State Street in Belvidere, Boone County. The project includes a lighted sidewalk and riverfront shore stabilization. Bids are scheduled to be received as part of the January 16, 2026 letting at 12:00 PM Central Time.
AvailableCity of Albany
Complete a long-term viability study needed to evaluate the future of the Vine Street Water Treatment Plant (WTP). Study shall include analysis of the existing conditions at the WTP and other water systems as related to plant operations, and a cost benefit analysis comparing options to make improvements on site compared to decommissioning the WTP and constructing a new plant at an alternate site.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
City of Albany
Close: Jan 6, 2026
Complete a long-term viability study needed to evaluate the future of the Vine Street Water Treatment Plant (WTP). Study shall include analysis of the existing conditions at the WTP and other water systems as related to plant operations, and a cost benefit analysis comparing options to make improvements on site compared to decommissioning the WTP and constructing a new plant at an alternate site.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →