Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Reno
Work includes repair of concrete and structure access corridor trench walls.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Reno
The City of Reno issued an Invitation for Bid (CP-2025-22) for the ReTRAC Trench Rehabilitation Project to repair concrete and structures on the Reno Transportation Rail Access Corridor (ReTRAC) trench walls. Work includes shoring, concrete removal and repair, sealing, coordination with Union Pacific Railroad and Jacobs Entertainment, a mandatory site walk, and compliance with Nevada contractor licensing, prevailing wage, and bonding requirements.
Posted Date
Nov 3, 2025
Due Date
Dec 9, 2025
Release: Nov 3, 2025
City of Reno
Close: Dec 9, 2025
The City of Reno issued an Invitation for Bid (CP-2025-22) for the ReTRAC Trench Rehabilitation Project to repair concrete and structures on the Reno Transportation Rail Access Corridor (ReTRAC) trench walls. Work includes shoring, concrete removal and repair, sealing, coordination with Union Pacific Railroad and Jacobs Entertainment, a mandatory site walk, and compliance with Nevada contractor licensing, prevailing wage, and bonding requirements.
AvailableCity of Dearborn Heights
Project consists of the removal and replacement of approx., 184 LF of a trench drain structure in the vehicle maintenance area.
Posted Date
Nov 12, 2025
Due Date
Nov 26, 2025
Release: Nov 12, 2025
City of Dearborn Heights
Close: Nov 26, 2025
Project consists of the removal and replacement of approx., 184 LF of a trench drain structure in the vehicle maintenance area.
AvailableCity of Sarasota
WWTP comprehensive rehabilitation construction project.
Posted Date
Nov 6, 2025
Due Date
Jan 22, 2026
Release: Nov 6, 2025
City of Sarasota
Close: Jan 22, 2026
WWTP comprehensive rehabilitation construction project.
AvailableTown of Parkton
The project includes the rehabilitation of existing Wells No. 1, No. 4, and No. 5. The rehabilitation of Well No. 1 includes construction of a transfer switch for a portable generator, replacement heater, roof repairs, electrical and SCADA equipment. The rehabilitation of Well No. 4 includes construction of a standby generator with transfer switch, electrical and SCADA equipment, green sand filter, chemical feed systems, piping replacements, relocating electrical box, connection to existing sewer for backwash, test blowoff hydrant. The rehabilitation of Well No. 5 includes construction of a new well house for existing well and electrical panels, new standby generator with transfer switch, blowoff at wellhead, and electrical and SCADA equipment. See outside links for more details.
Posted Date
Oct 6, 2025
Due Date
Dec 4, 2025
Release: Oct 6, 2025
Town of Parkton
Close: Dec 4, 2025
The project includes the rehabilitation of existing Wells No. 1, No. 4, and No. 5. The rehabilitation of Well No. 1 includes construction of a transfer switch for a portable generator, replacement heater, roof repairs, electrical and SCADA equipment. The rehabilitation of Well No. 4 includes construction of a standby generator with transfer switch, electrical and SCADA equipment, green sand filter, chemical feed systems, piping replacements, relocating electrical box, connection to existing sewer for backwash, test blowoff hydrant. The rehabilitation of Well No. 5 includes construction of a new well house for existing well and electrical panels, new standby generator with transfer switch, blowoff at wellhead, and electrical and SCADA equipment. See outside links for more details.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis