Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Mobile County Hospital Board
Transite pipe replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Glynn County School District
R. H. Tyson Construction, Inc., as Construction Manager for the Glynn County Board of Education, is requesting sealed proposals from subcontractors for Phase 3 sub‑packages of the Glyndale Elementary Replacement, a new approximately 126,000 SF school. Proposals are due by 11:00 AM ET on Tuesday, December 16, 2025, at the BOE Maintenance Office; documents are provided on request via email to the Construction Manager.
Posted Date
-
Due Date
Dec 16, 2025
Glynn County School District
Close: Dec 16, 2025
R. H. Tyson Construction, Inc., as Construction Manager for the Glynn County Board of Education, is requesting sealed proposals from subcontractors for Phase 3 sub‑packages of the Glyndale Elementary Replacement, a new approximately 126,000 SF school. Proposals are due by 11:00 AM ET on Tuesday, December 16, 2025, at the BOE Maintenance Office; documents are provided on request via email to the Construction Manager.
AvailableWayne State College
Work includes : dorm sink, supply & sanitary pipe replacement.
Posted Date
-
Due Date
Dec 4, 2025
Wayne State College
Close: Dec 4, 2025
Work includes : dorm sink, supply & sanitary pipe replacement.
AvailableRenton School District 403
Skanska USA Building, Inc., as GC/CM for Renton School District, invites sealed bids for the Renton High School Replacement Home Demolition & Abatement (Phase 3) covering BP 02C Demolition & Abatement and BP 32C Hydroseeding. Bids are due at the Renton School District Facilities Operations and Maintenance Center on November 19, 2025 (09:00 AM for BP 02C and 09:30 AM for BP 32C), with a non-mandatory pre-bid meeting on November 3, 2025.
Posted Date
-
Due Date
Nov 19, 2025
Renton School District 403
Close: Nov 19, 2025
Skanska USA Building, Inc., as GC/CM for Renton School District, invites sealed bids for the Renton High School Replacement Home Demolition & Abatement (Phase 3) covering BP 02C Demolition & Abatement and BP 32C Hydroseeding. Bids are due at the Renton School District Facilities Operations and Maintenance Center on November 19, 2025 (09:00 AM for BP 02C and 09:30 AM for BP 32C), with a non-mandatory pre-bid meeting on November 3, 2025.
AvailableAlderwood Water And Wastewater District
Work under this contract is to replace existing isolation valves and installing new tees for pipe access on the district's 24" & 30" ductile iron (di) potable water transmission mains at three (3) separate site locations and includes: installation of one (1) 16" butterfly valve, one (1) 24" butterfly valve, three (3) 30" district supplied butterfly valves with appurtenances; installation of one (1) 30" by 16" tee, two (2) 30" by 24" tees and one (1) precast concrete access vault with appurtenances for pipe access; removal and replacement of approximately 50 linear feet of 12" diameter di water main with 16" diameter water main, including replacement of two (2) 12" diameter gate valves, fittings, appurtenances, and installation two (2) new 12" insertion valves at one site location; removal and replacement of impacted storm drain at site 3-06b; removal, hauling, and disposal of existing transmission main piping, water main piping, valves, appurtenances; roadway and property restoration, site cleanup, and temporary traffic control.
Posted Date
Sep 30, 2025
Due Date
Dec 2, 2025
Release: Sep 30, 2025
Alderwood Water And Wastewater District
Close: Dec 2, 2025
Work under this contract is to replace existing isolation valves and installing new tees for pipe access on the district's 24" & 30" ductile iron (di) potable water transmission mains at three (3) separate site locations and includes: installation of one (1) 16" butterfly valve, one (1) 24" butterfly valve, three (3) 30" district supplied butterfly valves with appurtenances; installation of one (1) 30" by 16" tee, two (2) 30" by 24" tees and one (1) precast concrete access vault with appurtenances for pipe access; removal and replacement of approximately 50 linear feet of 12" diameter di water main with 16" diameter water main, including replacement of two (2) 12" diameter gate valves, fittings, appurtenances, and installation two (2) new 12" insertion valves at one site location; removal and replacement of impacted storm drain at site 3-06b; removal, hauling, and disposal of existing transmission main piping, water main piping, valves, appurtenances; roadway and property restoration, site cleanup, and temporary traffic control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis