Retrieving RFP details
Release
Close
Three Affiliated Tribes
Project consists of the partial removal of a hillside, disposal of wasted material in two sites, grading, reconstruction of an access road, road ditch regrading and erosion control devices, and removal/replacement of rip-rap. See outside link.
Three Affiliated Tribes
Install 2" PVC gasketed joint pipe, 1" special meters, 2" cleanouts, road crossings, tie-ins to existing pipelines, and all other related appurtenant items.
Three Affiliated Tribes
Pump station and control vault.
Forsyth County
Water intake contract B tunnels, shafts, and intake structure. Rock Tunnel and Shaft Construction - Includes construction of the pump station tunnel, pump station shaft, and intermediate shaft. Rock tunneling methods, including drilling and blasting, are required to construct the tunnel and shafts. Permanent linings will be installed in the pump station shaft and pump station tunnel. Microtunnel Construction - Microtunneling is planned to construct the intake tunnel. Intake Structure Construction - The intake structure will be constructed in Lake Sidney Lanier. The work will involve various underwater construction processes.
Release
Oct 08, 2025
Close
Nov 20, 2025