Three Affiliated Tribes
Pump station and control vault.
Three Affiliated Tribes
Install 2" PVC gasketed joint pipe, 1" special meters, 2" cleanouts, road crossings, tie-ins to existing pipelines, and all other related appurtenant items.
Three Affiliated Tribes
Project consists of the partial removal of a hillside, disposal of wasted material in two sites, grading, reconstruction of an access road, road ditch regrading and erosion control devices, and removal/replacement of rip-rap. See outside link.
Huntington Sanitary Board
Rehabilitation of the existing 4th street pump station facility including demolition of existing pump station above grade components, internal dry well components, pumping equipment and appurtenances, and electrical control and instrumentation components; modifications to convert the existing dry well substructure to a submersible wet well; installation of new pumping equipment and appurtenances, electrical control and instrumentation components; new control building; standby generator; installation of a combined sewer regulator structure and sewer improvements; and completion of site improvements and restoration.
Release
Oct 24, 2025
Close
Nov 20, 2025