Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Terre Haute
Work includes installing approx. 4,280 LF of new roadway alignment including: storm sewer, lighting conduit, pavement markings, and signage. The work will also consist of the removal of existing avenue, installation of a detention pond, maintenance of traffic, temporary erosion control, seeding/sodding and a roundabout at the intersection. The work also includes the installation of new sanitary sewer and water main. Also includes 7,146 LF of video inspection for pipe; see outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Terre Haute
The contract will consist of the following: Rehabilitation (lining) via Cured-in-Place Pipe (CIPP) of approx. 3,130 LF of 20" force main, and replacement, via open cut, of approx. 540 LF of 18" force main, and new construction of approx. 95 LF of 24" and 20 LF of 30" gravity sewers via open cut; replacement of the existing Park Avenue Lift Station, including bypass pumping, removal of existing lift station equipment and associated structures, installation of new structures, piping, pumping equipment and associated appurtenances, and site improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 2, 2025
Release: Nov 7, 2025
City of Terre Haute
Close: Dec 2, 2025
The contract will consist of the following: Rehabilitation (lining) via Cured-in-Place Pipe (CIPP) of approx. 3,130 LF of 20" force main, and replacement, via open cut, of approx. 540 LF of 18" force main, and new construction of approx. 95 LF of 24" and 20 LF of 30" gravity sewers via open cut; replacement of the existing Park Avenue Lift Station, including bypass pumping, removal of existing lift station equipment and associated structures, installation of new structures, piping, pumping equipment and associated appurtenances, and site improvements.
AvailableCity of Thomaston
Work to be completed for the Avenue N Stormwater & Road Repairs is described briefly as follows: In general, construction shall consist of installation of approx. 40 LF of 54" reinforced concrete pipe (RCP), two headwalls, two drop inlets, a standard duty asphalt road patch, and two 24" curb and gutter segments. Also, the project includes removing existing trees, site grading and stream channel improvements.
Posted Date
Oct 22, 2025
Due Date
Nov 20, 2025
Release: Oct 22, 2025
City of Thomaston
Close: Nov 20, 2025
Work to be completed for the Avenue N Stormwater & Road Repairs is described briefly as follows: In general, construction shall consist of installation of approx. 40 LF of 54" reinforced concrete pipe (RCP), two headwalls, two drop inlets, a standard duty asphalt road patch, and two 24" curb and gutter segments. Also, the project includes removing existing trees, site grading and stream channel improvements.
AvailablePasco County
Work includes to widen avenue to add a westbound left-turn lane at kitten trail and an eastbound left-turn lane at east road.
Posted Date
Oct 8, 2025
Due Date
Nov 18, 2025
Release: Oct 8, 2025
Pasco County
Close: Nov 18, 2025
Work includes to widen avenue to add a westbound left-turn lane at kitten trail and an eastbound left-turn lane at east road.
City of Thomaston
Construction shall consist of installation of approx 40 LF of 54" reinforced concrete pipe (RCP), two headwalls, two drop inlets, a standard duty asphalt road patch, and two 24" curb and gutter segments. Also, the project includes removing existing trees, site grading, and stream channel improvements.
Posted Date
Oct 22, 2025
Due Date
Nov 20, 2025
Release: Oct 22, 2025
City of Thomaston
Close: Nov 20, 2025
Construction shall consist of installation of approx 40 LF of 54" reinforced concrete pipe (RCP), two headwalls, two drop inlets, a standard duty asphalt road patch, and two 24" curb and gutter segments. Also, the project includes removing existing trees, site grading, and stream channel improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis