Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Brazoria County (Purchasing Department) issued RFP ID 26-22 for the Terminal Building Standby Generator Project to supply, install and test a standby generator at the Texas Gulf Coast Regional Airport in Angleton, TX. Sealed proposals are due January 22, 2026 at 11:00 AM local time; a pre-offer meeting and site visit is scheduled for January 6, 2026 at 10:00 AM at the airport, and proposal submission/registration must be done through Brazoria County’s Bonfire portal. RFP documents and procurement package are available from Brazoria County’s purchasing bid opportunities page and the Bonfire portal; the solicitation is a competitive procurement (RFP), not a grant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide a contract to install a 300 kw three-phased permanent diesel generator, concrete pad, and automatic transfer switch to support the airport terminal and fixed based operator (FBO) support hanger.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
Provide a contract to install a 300 kw three-phased permanent diesel generator, concrete pad, and automatic transfer switch to support the airport terminal and fixed based operator (FBO) support hanger.
AvailablePremium
Access the largest public sector contact database
Work includes installing a new standby diesel generator, automatic transfer switch and new main switchboard, including a utility (smud) connection and back feeding the existing main switchboard. Work also includes all associated electrical work, excavation, trenching, compaction, subgrade, concrete foundations, pads and walkways, asphalt, fencing.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Work includes installing a new standby diesel generator, automatic transfer switch and new main switchboard, including a utility (smud) connection and back feeding the existing main switchboard. Work also includes all associated electrical work, excavation, trenching, compaction, subgrade, concrete foundations, pads and walkways, asphalt, fencing.
AvailableWork includes installing a new standby diesel generator, automatic transfer switch and new main switchboard, including a utility (smud) connection and back feeding the existing main switchboard. Work also includes all associated electrical work, excavation, trenching, compaction, subgrade, concrete foundations, pads and walkways, asphalt, fencing.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Work includes installing a new standby diesel generator, automatic transfer switch and new main switchboard, including a utility (smud) connection and back feeding the existing main switchboard. Work also includes all associated electrical work, excavation, trenching, compaction, subgrade, concrete foundations, pads and walkways, asphalt, fencing.
AvailableGenerator Project.
Posted Date
Nov 27, 2025
Due Date
Dec 12, 2025
Release: Nov 27, 2025
Close: Dec 12, 2025
Generator Project.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis