Retrieving RFP details
Release
Close
City of Lansing
The work consist of approx 313 FT 24" modified sewer removal; 4,360 SY modified pavement removal; 1,455 FT curb and gutter removal; 110 FT silt fence erosion control; 121 FT 12" sewer pipe; 450 FT 54" clean and televise sewer; 2,900 SF 4" modified concrete sidewalk.
Lackawanna River Basin Sewer Authority
Work includes upgrades to lrbsa's existing infrastructure, including installation of new gravity and force main sewers. Construction will include open trenching through the moosic flood protection levee and a directional-drilled stream crossing under springbrook creek. Pump station upgrades include interior piping replacement and wet well coating.
Township of South Hanover
Construction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
City of Washington
The project consists of rehabilitating the existing Cherry Run Pump Station with two (2) new 300GPM pumps, extending the existing 12-force main serving Cherry Run and other west side pump stations by 1,380 LF (LF) along Plymouth Street and tie-in to the existing 18-inch force main at the WWTP, and replace approximately 2,200 LF of existing 12" cast iron force main and 4,400 LF of existing 8" cast ion/asbestos cement force main with new PVC force main of the same size.
Release
Oct 19, 2025
Close
Nov 25, 2025