Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes dredge approximately 225 cubic yards of sediment (covering approximately 3,201 square feet) from the taylors point channel.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DelDOT is soliciting bids for the Access as Nature Intended: Taylors Bridge Resiliency Project in New Castle County, DE, which includes removal of Bridge 1-447 and construction of a new multi-span concrete girder bridge, utility coordination, wetland mitigation, and approximately 1.7 miles of road reconstruction. Bids are due December 16, 2025 before 2:00 p.m. local time; the project is a federally-aided highway construction contract and not a grant.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
DelDOT is soliciting bids for the Access as Nature Intended: Taylors Bridge Resiliency Project in New Castle County, DE, which includes removal of Bridge 1-447 and construction of a new multi-span concrete girder bridge, utility coordination, wetland mitigation, and approximately 1.7 miles of road reconstruction. Bids are due December 16, 2025 before 2:00 p.m. local time; the project is a federally-aided highway construction contract and not a grant.
Premium
Access the largest public sector contact database
Hydraulic Dredging approximately 310,000 cubic yards of sediment from Bancroft Channel and East Main Bay of Fountain Lake, and potentially an addition of 240,000 cubic yards of sediment from North (Bancroft) Bay (approximately 550,000 cubic yards total), inclusive of pipeline transport, placement of Dredge material at constructed upland confined disposal facility (CDF) and operation and maintenance of the CDF for the life of the Contract.
Posted Date
Nov 24, 2025
Due Date
Jan 16, 2026
Release: Nov 24, 2025
Close: Jan 16, 2026
Hydraulic Dredging approximately 310,000 cubic yards of sediment from Bancroft Channel and East Main Bay of Fountain Lake, and potentially an addition of 240,000 cubic yards of sediment from North (Bancroft) Bay (approximately 550,000 cubic yards total), inclusive of pipeline transport, placement of Dredge material at constructed upland confined disposal facility (CDF) and operation and maintenance of the CDF for the life of the Contract.
AvailableThe City of St. Petersburg is soliciting a qualified design-build firm to provide progressive design-build services (including pre-construction, design, permitting, and construction) for the Marina Redevelopment Project (Project No. 25204-130) covering the North, Central, and South Marina Basins, including floating docks, dock houses, fueling facilities, seawalls, a bridge to Demens Landing, and associated infrastructure. The procurement anticipates a Guaranteed Maximum Price, has a construction budget shown as $148,000,000, requires extensive coastal/marine experience and robust insurance and bonding, and includes MBE/SBE/WBE/DBE preferences.
Posted Date
Nov 20, 2025
Due Date
Jan 8, 2026
Release: Nov 20, 2025
Close: Jan 8, 2026
The City of St. Petersburg is soliciting a qualified design-build firm to provide progressive design-build services (including pre-construction, design, permitting, and construction) for the Marina Redevelopment Project (Project No. 25204-130) covering the North, Central, and South Marina Basins, including floating docks, dock houses, fueling facilities, seawalls, a bridge to Demens Landing, and associated infrastructure. The procurement anticipates a Guaranteed Maximum Price, has a construction budget shown as $148,000,000, requires extensive coastal/marine experience and robust insurance and bonding, and includes MBE/SBE/WBE/DBE preferences.
AvailableProvide the services necessary to winterize the marina and protect it from freezing over the winter.
Posted Date
Nov 20, 2025
Due Date
Dec 31, 2025
Release: Nov 20, 2025
Close: Dec 31, 2025
Provide the services necessary to winterize the marina and protect it from freezing over the winter.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis