Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Tannery bridge replacement and other incidental work includes common excavation, 930 CY aggregate subbase course gravel, 150 ton hot mix asphalt 12.5 MM HMA surface, saw cut grooving.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Traffic signal replacement and ADA improvements and various intersections plus other incidental work includes 45 SY pavement butt joints, 80 ton hot mix asphalt 9.5mm, 120 SY plain concrete sidewalk, 205 SF curb ramp detectable warning.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Traffic signal replacement and ADA improvements and various intersections plus other incidental work includes 45 SY pavement butt joints, 80 ton hot mix asphalt 9.5mm, 120 SY plain concrete sidewalk, 205 SF curb ramp detectable warning.
AvailableHighway construction, ITS installation and other incidental work includes 41,200 CY rock excavation, 158,140 CY aggregate base course type C, 25,400 t hot mix asphalt 12.5 MM base, 1,900 SY emulsified asphalt sealcoat applied, 690 LF 30" reinforced concrete pipe class III, 67,100 LF woven fire fence metal posts.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
Close: Dec 17, 2025
Highway construction, ITS installation and other incidental work includes 41,200 CY rock excavation, 158,140 CY aggregate base course type C, 25,400 t hot mix asphalt 12.5 MM base, 1,900 SY emulsified asphalt sealcoat applied, 690 LF 30" reinforced concrete pipe class III, 67,100 LF woven fire fence metal posts.
AvailableWork includes demolition of an existing bridge and the construction of a new 99-foot single span prestressed concrete NU girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work.
Posted Date
Nov 26, 2025
Due Date
Dec 29, 2025
Release: Nov 26, 2025
Close: Dec 29, 2025
Work includes demolition of an existing bridge and the construction of a new 99-foot single span prestressed concrete NU girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work.
AvailableWindow replacement, repair and other WAP related work for annual weatherization services.
Posted Date
Dec 4, 2025
Due Date
Dec 15, 2025
Release: Dec 4, 2025
Close: Dec 15, 2025
Window replacement, repair and other WAP related work for annual weatherization services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis