Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Ball State University
Replacement of an existing 4-pipe air handling unit serving the elevator machine room with a new split-system electric heat-pump air handler, HVAC controls, and electrical alterations. Controls include compatible connection to the existing building management system. Electrical alterations include elevator code compliance improvements for electrical power, new emergency power circuits from the existing emergency power system, separation of power to dedicated circuits, lighting, and fire alarm systems modifications.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Burnet County
Provide the installation of a limited use/limited application elevator.
Posted Date
Sep 10, 2025
Due Date
Dec 2, 2025
Release: Sep 10, 2025
Burnet County
Close: Dec 2, 2025
Provide the installation of a limited use/limited application elevator.
AvailableJoint Meeting of Essex and Union Counties
Provide digester elevator replacement work.
Posted Date
May 23, 2025
Due Date
Nov 25, 2025
Release: May 23, 2025
Joint Meeting of Essex and Union Counties
Close: Nov 25, 2025
Provide digester elevator replacement work.
AvailableCity of Trenton
Electrical service, electrical improvements, and repair at various facilities in the city. The Contractor shall provide all labor, materials, equipment, supervision and supplies necessary to furnish and install electrical services; change current lighting to LED, perform electrical repairs; and inspect electrical components for the purpose of diagnosing and repairing electrical systems in city buildings, facilities, etc.
Posted Date
Jul 3, 2025
Due Date
Nov 25, 2025
Release: Jul 3, 2025
City of Trenton
Close: Nov 25, 2025
Electrical service, electrical improvements, and repair at various facilities in the city. The Contractor shall provide all labor, materials, equipment, supervision and supplies necessary to furnish and install electrical services; change current lighting to LED, perform electrical repairs; and inspect electrical components for the purpose of diagnosing and repairing electrical systems in city buildings, facilities, etc.
San Francisco Public Works
The project will demolish nearly all existing park features and the street pedestrian bridge. The existing upperlevel restrooms and the parking garage below will remain in place. The plaza will be completed with new drainage and waterproofing, new paving, landscape planters, irrigation, decorative walls, stairs, curbs, railings, shade structures, playground structures, lighting, and electrical systems. Architectural work includes the construction of a clubhouse building and select retrofit of structural concrete. The existing hotel building at the east side of the pedestrian bridge as well as the parking garage below shall be occupied and used by the public during construction.
Posted Date
Mar 12, 2025
Due Date
Dec 10, 2025
Release: Mar 12, 2025
San Francisco Public Works
Close: Dec 10, 2025
The project will demolish nearly all existing park features and the street pedestrian bridge. The existing upperlevel restrooms and the parking garage below will remain in place. The plaza will be completed with new drainage and waterproofing, new paving, landscape planters, irrigation, decorative walls, stairs, curbs, railings, shade structures, playground structures, lighting, and electrical systems. Architectural work includes the construction of a clubhouse building and select retrofit of structural concrete. The existing hotel building at the east side of the pedestrian bridge as well as the parking garage below shall be occupied and used by the public during construction.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis