Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Burnet County
Provide the installation of a limited use/limited application elevator.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Joint Meeting of Essex and Union Counties
Provide digester elevator replacement work.
Posted Date
May 23, 2025
Due Date
Nov 25, 2025
Release: May 23, 2025
Joint Meeting of Essex and Union Counties
Close: Nov 25, 2025
Provide digester elevator replacement work.
AvailableCleveland County
Installation and upgrades of existing elevator.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
Cleveland County
Close: Dec 4, 2025
Installation and upgrades of existing elevator.
AvailableCity of New York
Furnish and install the titan tbk-10 dual brake plunger assembly, by removing the elevator from service and secure, remove single brake assembly/ related, install dual brake assembly/ related, perform weight test restore elevator to service, schedule witnessing.
Posted Date
Jan 30, 2025
Due Date
Dec 1, 2025
Release: Jan 30, 2025
City of New York
Close: Dec 1, 2025
Furnish and install the titan tbk-10 dual brake plunger assembly, by removing the elevator from service and secure, remove single brake assembly/ related, install dual brake assembly/ related, perform weight test restore elevator to service, schedule witnessing.
AvailableBall State University
Replacement of an existing 4-pipe air handling unit serving the elevator machine room with a new split-system electric heat-pump air handler, HVAC controls, and electrical alterations. Controls include compatible connection to the existing building management system. Electrical alterations include elevator code compliance improvements for electrical power, new emergency power circuits from the existing emergency power system, separation of power to dedicated circuits, lighting, and fire alarm systems modifications.
Posted Date
Oct 24, 2025
Due Date
Dec 4, 2025
Release: Oct 24, 2025
Ball State University
Close: Dec 4, 2025
Replacement of an existing 4-pipe air handling unit serving the elevator machine room with a new split-system electric heat-pump air handler, HVAC controls, and electrical alterations. Controls include compatible connection to the existing building management system. Electrical alterations include elevator code compliance improvements for electrical power, new emergency power circuits from the existing emergency power system, separation of power to dedicated circuits, lighting, and fire alarm systems modifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis