Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include: approx 4,000 LF of street improvements, 2,300 LF of storm drainage improvements, 4,500 SY of sidewalk/trail construction, lighting, landscaping, and other miscellaneous items associated with street construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx. 1,140 LF of silt fence (SD1-type 'NS'); 622 LF of 30" RCP storm pipe; 548 LF of 36" RCP storm pipe; 550 SY of number 57 stone pipe bedding, 8" thickness; 409 LF of 4" perforated pipe with sock; 1,705 CY of grading, demucking, topsoiling, and reapplying of existing soils; see attached file and outside links for more details.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Work includes approx. 1,140 LF of silt fence (SD1-type 'NS'); 622 LF of 30" RCP storm pipe; 548 LF of 36" RCP storm pipe; 550 SY of number 57 stone pipe bedding, 8" thickness; 409 LF of 4" perforated pipe with sock; 1,705 CY of grading, demucking, topsoiling, and reapplying of existing soils; see attached file and outside links for more details.
Premium
Access the largest public sector contact database
Work includes 17 EA of tree removal; 3,900 SY of grading; 1,100 TN of trench backfill; 16 SY of stone riprap, class a3; 16 SY of filter fabric; 263 of portland cement concrete roadway pavement; 40 TN of HMA roadway repair; 253 SF of portland cement concrete sidewalk 4"; 114 SY of aggregate driveway repair; 283 SY of pavement removal; 183 SY of driveway pavement removal; 253 SF of sidewalk removal; 15 EA of drainage structure to be removed; 125 SY of grading; 114 SF of sidewalk removal; 20 TN of HMA roadway repair; 114 SF of portland cement concrete sidewalk 4"; etc, see attached file.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Work includes 17 EA of tree removal; 3,900 SY of grading; 1,100 TN of trench backfill; 16 SY of stone riprap, class a3; 16 SY of filter fabric; 263 of portland cement concrete roadway pavement; 40 TN of HMA roadway repair; 253 SF of portland cement concrete sidewalk 4"; 114 SY of aggregate driveway repair; 283 SY of pavement removal; 183 SY of driveway pavement removal; 253 SF of sidewalk removal; 15 EA of drainage structure to be removed; 125 SY of grading; 114 SF of sidewalk removal; 20 TN of HMA roadway repair; 114 SF of portland cement concrete sidewalk 4"; etc, see attached file.
AvailableWork includes 17 EA of tree removal; 3,900 SY of grading; 1,100 TN of trench backfill; 16 SY of stone riprap, class a3; 16 SY of filter fabric; 263 of portland cement concrete roadway pavement; 40 TN of HMA roadway repair; 253 SF of portland cement concrete sidewalk 4"; 114 SY of aggregate driveway repair; 283 SY of pavement removal; 183 SY of driveway pavement removal; 253 SF of sidewalk removal; 15 EA of drainage structure to be removed; 125 SY of grading; 114 SF of sidewalk removal; 20 TN of HMA roadway repair; 114 SF of portland cement concrete sidewalk 4"; etc, see attached file.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Work includes 17 EA of tree removal; 3,900 SY of grading; 1,100 TN of trench backfill; 16 SY of stone riprap, class a3; 16 SY of filter fabric; 263 of portland cement concrete roadway pavement; 40 TN of HMA roadway repair; 253 SF of portland cement concrete sidewalk 4"; 114 SY of aggregate driveway repair; 283 SY of pavement removal; 183 SY of driveway pavement removal; 253 SF of sidewalk removal; 15 EA of drainage structure to be removed; 125 SY of grading; 114 SF of sidewalk removal; 20 TN of HMA roadway repair; 114 SF of portland cement concrete sidewalk 4"; etc, see attached file.
AvailableRelease: Nov 2, 2025
Close: Dec 17, 2025
Drainage Improvements.