Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of Storm Water Drain #547 Improvements for Clear Creek 3rd & 4th Addition - Phase 8.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of construction services for Water Distribution System and Sanitary Sewer Improvements for Turkey Creek 4th Addition, Phases 4 and 5.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Procurement of construction services for Water Distribution System and Sanitary Sewer Improvements for Turkey Creek 4th Addition, Phases 4 and 5.
Premium
Access the largest public sector contact database
Procurement of services for constructing a Water Distribution System and Sanitary Sewer Improvements for Abilene Place Addition Phase 2.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Procurement of services for constructing a Water Distribution System and Sanitary Sewer Improvements for Abilene Place Addition Phase 2.
Water distribution system with sanitary sewer improvements. Site clearing; site restoration; seeding; maintain existing bmps; 2 ea bmp, curb inlet protection; 1,969 lf pipe, wl 8"; 5 lf pipe, wl 8" dicl; 3 ea fire hydrant assembly; 1 ea valve assembly, blowoff 2"; 1 ea valve assembly, 8"; 1 ea valve assembly, anchored 8", special; 2,108 lf pipe, ss 8"; 7 ea riser assembly 4", vertical; 8 ea mh, standard ss (4'); 40 lf fill, flowable; 104 lf fill, sand (flushed & vibrated); 2,108 lf air testing, ss pipe; 1 ea bmp, construction entrance; 2 ea bmp, drop inlet protection; 1,070 lf bmp, mulch wattle. See outside link.
Posted Date
Nov 27, 2025
Due Date
Dec 12, 2025
Release: Nov 27, 2025
Close: Dec 12, 2025
Water distribution system with sanitary sewer improvements. Site clearing; site restoration; seeding; maintain existing bmps; 2 ea bmp, curb inlet protection; 1,969 lf pipe, wl 8"; 5 lf pipe, wl 8" dicl; 3 ea fire hydrant assembly; 1 ea valve assembly, blowoff 2"; 1 ea valve assembly, 8"; 1 ea valve assembly, anchored 8", special; 2,108 lf pipe, ss 8"; 7 ea riser assembly 4", vertical; 8 ea mh, standard ss (4'); 40 lf fill, flowable; 104 lf fill, sand (flushed & vibrated); 2,108 lf air testing, ss pipe; 1 ea bmp, construction entrance; 2 ea bmp, drop inlet protection; 1,070 lf bmp, mulch wattle. See outside link.
Water distribution and sanitary sewer improvements.
Posted Date
Nov 27, 2025
Due Date
Dec 12, 2025
Release: Nov 27, 2025
Close: Dec 12, 2025
Water distribution and sanitary sewer improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis