Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water distribution and sanitary sewer improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services for constructing a Water Distribution System and Sanitary Sewer Improvements for Abilene Place Addition Phase 2.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Procurement of services for constructing a Water Distribution System and Sanitary Sewer Improvements for Abilene Place Addition Phase 2.
Premium
Access the largest public sector contact database
Procurement of construction services for Water Distribution System and Sanitary Sewer Improvements for Turkey Creek 4th Addition, Phases 4 and 5.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Procurement of construction services for Water Distribution System and Sanitary Sewer Improvements for Turkey Creek 4th Addition, Phases 4 and 5.
Water distribution system with sanitary sewer improvements. Site clearing; site restoration; seeding; maintain existing bmps; 2 ea bmp, curb inlet protection; 1,969 lf pipe, wl 8"; 5 lf pipe, wl 8" dicl; 3 ea fire hydrant assembly; 1 ea valve assembly, blowoff 2"; 1 ea valve assembly, 8"; 1 ea valve assembly, anchored 8", special; 2,108 lf pipe, ss 8"; 7 ea riser assembly 4", vertical; 8 ea mh, standard ss (4'); 40 lf fill, flowable; 104 lf fill, sand (flushed & vibrated); 2,108 lf air testing, ss pipe; 1 ea bmp, construction entrance; 2 ea bmp, drop inlet protection; 1,070 lf bmp, mulch wattle. See outside link.
Posted Date
Nov 27, 2025
Due Date
Dec 12, 2025
Release: Nov 27, 2025
Close: Dec 12, 2025
Water distribution system with sanitary sewer improvements. Site clearing; site restoration; seeding; maintain existing bmps; 2 ea bmp, curb inlet protection; 1,969 lf pipe, wl 8"; 5 lf pipe, wl 8" dicl; 3 ea fire hydrant assembly; 1 ea valve assembly, blowoff 2"; 1 ea valve assembly, 8"; 1 ea valve assembly, anchored 8", special; 2,108 lf pipe, ss 8"; 7 ea riser assembly 4", vertical; 8 ea mh, standard ss (4'); 40 lf fill, flowable; 104 lf fill, sand (flushed & vibrated); 2,108 lf air testing, ss pipe; 1 ea bmp, construction entrance; 2 ea bmp, drop inlet protection; 1,070 lf bmp, mulch wattle. See outside link.
The Project includes the following Work: demolition of Old Administration Building and existing chlorine facilities, addition of temporary chemical feed facility, addition of new superpulsator tank and appurtenances, addition of new filter tank and appurtenances, addition of Controls Building with new chlorine gas, PAC, and corrosion inhibitor chemical storage and feed systems, replacement of caustic soda and ferric chloride equipment, HVAC and Plumbing improvements, SCADA upgrades and programming and associated sitework and other appurtenances.
Posted Date
Jul 5, 2022
Due Date
Jan 26, 2026
Release: Jul 5, 2022
Close: Jan 26, 2026
The Project includes the following Work: demolition of Old Administration Building and existing chlorine facilities, addition of temporary chemical feed facility, addition of new superpulsator tank and appurtenances, addition of new filter tank and appurtenances, addition of Controls Building with new chlorine gas, PAC, and corrosion inhibitor chemical storage and feed systems, replacement of caustic soda and ferric chloride equipment, HVAC and Plumbing improvements, SCADA upgrades and programming and associated sitework and other appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis