Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Village of Arlington Heights (IL) issued an open solicitation for the Station #13 Water Tank Rehab Project (Opportunity ID 250015) with an estimated value of $100,000–$500,000. Bids are due December 18, 2025 (public opening at 2:00 PM local time) and documents/attachments are available from the Village’s VBids portal (vendor login required). The posting requires bid security (10% of bid) and compliance with Illinois prevailing wage and EEO provisions; the Village reserves the right to reject proposals.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide station #13 water tank rehab project.
Posted Date
Dec 8, 2025
Due Date
Dec 18, 2025
Release: Dec 8, 2025
Close: Dec 18, 2025
Provide station #13 water tank rehab project.
AvailableThe Lift Station #13 Rehabilitation project. Bidder shall furnish all labor, equipment and materials to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system as applicable. The existing wet well below the top slab will remain. The project will include, but not be limited to, the rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, SCADA, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project. Construction of this project will require close coordination with the Owner and Engineer.
Posted Date
Oct 30, 2025
Due Date
Dec 15, 2025
Release: Oct 30, 2025
Close: Dec 15, 2025
The Lift Station #13 Rehabilitation project. Bidder shall furnish all labor, equipment and materials to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency generator system and fuel system as applicable. The existing wet well below the top slab will remain. The project will include, but not be limited to, the rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter vault, gravity sewer, valves, and fittings, macerator assembly, control system, SCADA, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project. Construction of this project will require close coordination with the Owner and Engineer.
AvailableConstruction of water system infrastructure: installation of approximately 3,140 linear feet of 8-inch waterline, upgrade of a 100 GPM booster pump station, construction of a new tank access road, and construction/installation of a 40,000-gallon water storage tank with foundation, valve vault, tank mixer, and related appurtenances.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
Construction of water system infrastructure: installation of approximately 3,140 linear feet of 8-inch waterline, upgrade of a 100 GPM booster pump station, construction of a new tank access road, and construction/installation of a 40,000-gallon water storage tank with foundation, valve vault, tank mixer, and related appurtenances.
AvailableWork includes installation of approx. 3,140 LF of 8" waterline, 8" PVC, C-900 DR 18, 100 GPM booster pump station upgrade, construction of a new tank access road, 40,000 gallon water storage tank, foundation, valve vault, tank mixer, and related appurtenances.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
Work includes installation of approx. 3,140 LF of 8" waterline, 8" PVC, C-900 DR 18, 100 GPM booster pump station upgrade, construction of a new tank access road, 40,000 gallon water storage tank, foundation, valve vault, tank mixer, and related appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis