Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Bulloch County School District
Removal and replacement of existing gravel surface built up roof systems for approximately 110 squares. Roof replacement includes roof deck repairs, base sheet system, insulation system, and a modified bitumen roof system. Roof repairs includes repairs on existing low slope roof areas and standing seam metal roof areas.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bulloch County School District
Removal and replacement of existing modified bitumen roof systems for approximately 179 squares. Roof replacement includes roof deck repairs, base sheet system, insulation system, and a modified bitumen roof system. Roof repairs includes repairs on existing standing seam metal roof areas.
Posted Date
Nov 18, 2025
Due Date
Jan 8, 2026
Release: Nov 18, 2025
Bulloch County School District
Close: Jan 8, 2026
Removal and replacement of existing modified bitumen roof systems for approximately 179 squares. Roof replacement includes roof deck repairs, base sheet system, insulation system, and a modified bitumen roof system. Roof repairs includes repairs on existing standing seam metal roof areas.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Berkeley County School District
Replacement and repairs of School roof and associated metal work.
Posted Date
Nov 5, 2025
Due Date
Dec 2, 2025
Release: Nov 5, 2025
Berkeley County School District
Close: Dec 2, 2025
Replacement and repairs of School roof and associated metal work.
AvailableThomasville City School District
Roof replacement Bldg. 100 (+/- 38,000 SF): Two roofs in place. Remove two roof assemblies down to original zonolite lightweight insulating vermiculite fill over metal formdeck. Install new temporary roof, lightweight insulating cellular concrete (LWIC) fill with insulporm rigid insulation board and fleece-back single ply membrane adhered to LWIC. 2. Roof recover Bldgs. 200, 201, 202, 300 & 400 Gym (+/- 16,100 SF): One single ply roof assembly in place. Existing roof to remain. Install new single ply assembly consisting of rigid insulation board, cover board and single ply membrane (adhered). Coverboard mechanically attached to existing structural metal deck. 3. Install overflow roof drains and storm drain piping at Bldg. 100.
Posted Date
Nov 12, 2025
Due Date
Dec 9, 2025
Release: Nov 12, 2025
Thomasville City School District
Close: Dec 9, 2025
Roof replacement Bldg. 100 (+/- 38,000 SF): Two roofs in place. Remove two roof assemblies down to original zonolite lightweight insulating vermiculite fill over metal formdeck. Install new temporary roof, lightweight insulating cellular concrete (LWIC) fill with insulporm rigid insulation board and fleece-back single ply membrane adhered to LWIC. 2. Roof recover Bldgs. 200, 201, 202, 300 & 400 Gym (+/- 16,100 SF): One single ply roof assembly in place. Existing roof to remain. Install new single ply assembly consisting of rigid insulation board, cover board and single ply membrane (adhered). Coverboard mechanically attached to existing structural metal deck. 3. Install overflow roof drains and storm drain piping at Bldg. 100.
AvailableBulloch County School District
Removal and replacement of existing modified bitumen roof systems for approximately 6 squares. Roof replacement includes roof deck repairs, insulation system, and a modified bitumen roof system. Roof repairs include repairs on standing seam metal roof areas. Associated sheet metal components and accessories are included.
Posted Date
Nov 18, 2025
Due Date
Jan 8, 2026
Release: Nov 18, 2025
Bulloch County School District
Close: Jan 8, 2026
Removal and replacement of existing modified bitumen roof systems for approximately 6 squares. Roof replacement includes roof deck repairs, insulation system, and a modified bitumen roof system. Roof repairs include repairs on standing seam metal roof areas. Associated sheet metal components and accessories are included.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →