Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 14 EA remove tree (6-inches to 12-inches); 2 EA remove tree (13-inches to 18-inches); 9 EA remove tree (25-inches to 36-inches); 1 EA remove tree (37-inches to 48-inches); 150 LF removal of culvert pipe; 15 LF removal of gate; 1 EA remove existing business sign (alpine storage); 2 EA reset vault; 2 EA reset water meter; 1 EA removal of fire hydrant assembly ; 5 EA removal of drop inlet; 60 SY removal of valley gutter; 840 LF removal of curb and gutter; 102 LF removal of trench drain; 2,200 CY roadway excavation. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Sumneytown Pike (SR 0063) Signal System Upgrade Project.
Posted Date
Dec 1, 2025
Due Date
Dec 18, 2025
Release: Dec 1, 2025
Close: Dec 18, 2025
The Sumneytown Pike (SR 0063) Signal System Upgrade Project.
AvailablePremium
Access the largest public sector contact database
Pedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Pedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
AvailablePedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Pedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
AvailableParking Lot Maintenance and Pavement Repairs Project.
Posted Date
Nov 9, 2025
Due Date
Dec 17, 2025
Release: Nov 9, 2025
Close: Dec 17, 2025
Parking Lot Maintenance and Pavement Repairs Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium