Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeks for dust collector replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacing the existing woodshop dust collection system in entirety with a new system to serve all the woodshop equipment throughout the shop. The new dust collection system shall be fitted with Code required dust collection devices inclusive of fire suppression, spark detection, and explosion isolation devices. The dust collection system shall be a pulse type cartridge collector. Dust collection system shall utilize standalone controls; there is no desired interconnection to the existing facility building management system for the new dust collector. All the woodshop equipment shall be removed from the shop and relocated back in by the awarded contractor and connected to the associated utilities. The existing heating and ventilating systems serving the woodshop will be removed. New heating and ventilation strategies will be implemented into the shop. The existing general exhaust systems within the woodshop and supporting finishing spaces will be upgraded. The existing electrical system serving the woodshop equipment and the new dust collector system and equipment will be modified as part of the project. Existing electrical bus ducts are present in the woodshop will be replaced with new. The woodshop and all associated support spaces are to be fitted with new LED lights. The woodshop’s existing walls shall be cleaned and painted. Project shall include replacement of existing fire sprinkler heads as needed to provide appropriate coverage with the new dust collection system layouts. Existing plumbing systems present in the woodshop and support spaces are to remain in place. A new compressed air plant will be included in this project.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Premium
Access the largest public sector contact database
Release: Dec 9, 2025
Close: Jan 6, 2026
Replacing the existing woodshop dust collection system in entirety with a new system to serve all the woodshop equipment throughout the shop. The new dust collection system shall be fitted with Code required dust collection devices inclusive of fire suppression, spark detection, and explosion isolation devices. The dust collection system shall be a pulse type cartridge collector. Dust collection system shall utilize standalone controls; there is no desired interconnection to the existing facility building management system for the new dust collector. All the woodshop equipment shall be removed from the shop and relocated back in by the awarded contractor and connected to the associated utilities. The existing heating and ventilating systems serving the woodshop will be removed. New heating and ventilation strategies will be implemented into the shop. The existing general exhaust systems within the woodshop and supporting finishing spaces will be upgraded. The existing electrical system serving the woodshop equipment and the new dust collector system and equipment will be modified as part of the project. Existing electrical bus ducts are present in the woodshop will be replaced with new. The woodshop and all associated support spaces are to be fitted with new LED lights. The woodshop’s existing walls shall be cleaned and painted. Project shall include replacement of existing fire sprinkler heads as needed to provide appropriate coverage with the new dust collection system layouts. Existing plumbing systems present in the woodshop and support spaces are to remain in place. A new compressed air plant will be included in this project.
AvailableInstallation of new dust collection system including removal of existing system.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Installation of new dust collection system including removal of existing system.
AvailableMillard Public Schools is soliciting sealed bids for the Millard South High School Furniture Replacement Phase 4 project. Bids are due by 2:00 p.m. local time on Tuesday, January 6, 2026, and will be publicly opened. Bid documents are provided electronically by the district upon request to the listed contact.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
Millard Public Schools is soliciting sealed bids for the Millard South High School Furniture Replacement Phase 4 project. Bids are due by 2:00 p.m. local time on Tuesday, January 6, 2026, and will be publicly opened. Bid documents are provided electronically by the district upon request to the listed contact.
AvailableMillard Public Schools is soliciting sealed bids for the Millard South High School Furniture Replacement Phase 4 project. Bids are due by 2:00 p.m. local time on Tuesday, January 6, 2026, and will be publicly opened. Bid documents are provided electronically by the district upon request to the listed contact.
Posted Date
Dec 11, 2025
Due Date
Jan 6, 2026
Release: Dec 11, 2025
Close: Jan 6, 2026
Millard Public Schools is soliciting sealed bids for the Millard South High School Furniture Replacement Phase 4 project. Bids are due by 2:00 p.m. local time on Tuesday, January 6, 2026, and will be publicly opened. Bid documents are provided electronically by the district upon request to the listed contact.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis