Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sealed-bid heavy civil construction to raise an existing earthen detention structure ~15 feet and build related works: ~200 ft x 75 ft reinforced concrete spillway, a 12'×10' by 40' reinforced concrete slide gate structure, reinforced concrete low-flow inlet and flow-control outlet structures, 305 lf of 48-inch ductile iron pipe, ~1,500 lf gravel access road, 125 lf of 12-inch HDPE, abandonment of 160 lf of existing 36-inch storm pipe, chimney drains, erosion/water pollution control, site restoration and all related work. Contract completion required within 400 working days. Bids must be sealed paper submissions (no electronic bids), accompanied by a 5% bid deposit (cash/certified check/cashier's check or surety bond). A mandatory on-site pre-bid meeting is required and bidders must obtain any addenda from the county website.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Jul 10, 2025
Close: Dec 18, 2025
Phase 1.5 Detention Plan.
AvailableSouth apron expansion - phase 2 paving.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
South apron expansion - phase 2 paving.
AvailableThe work generally includes clearing, grubbing, excavation, embankment, seeding and mulching a proposed storm water detention basin and constructing an outlet structure.
Posted Date
Nov 21, 2025
Due Date
Dec 12, 2025
Release: Nov 21, 2025
Close: Dec 12, 2025
The work generally includes clearing, grubbing, excavation, embankment, seeding and mulching a proposed storm water detention basin and constructing an outlet structure.
The project includes improvements to existing drainage structures, grading and excavation of a new detention pond, installation of an outfall structure, erosion, control measures, as well as necessary utility relocations.
Posted Date
Nov 25, 2025
Due Date
Jan 8, 2026
Release: Nov 25, 2025
Close: Jan 8, 2026
The project includes improvements to existing drainage structures, grading and excavation of a new detention pond, installation of an outfall structure, erosion, control measures, as well as necessary utility relocations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis