Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Norco
The City of Norco Public Works Department is soliciting bids to upgrade the Snipes Park Booster Station and replace the Lake Norconian Flow Control Station, including new hydropneumatic tank, pump upgrades, controls, and site improvements, plus construction of a new above-grade flow control station with solar power and telemetry. The procurement is a lump‑sum construction bid (not a grant), currently in the Bidding stage, with electronic responses due by the stated deadline.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Norco
The City of Norco Public Works Department is soliciting bids to upgrade the Snipes Park Booster Station and replace the Lake Norconian Flow Control Station, including new hydropneumatic tank, pump upgrades, controls, and site improvements, plus construction of a new above-grade flow control station with solar power and telemetry. The procurement is a lump‑sum construction bid (not a grant), currently in the Bidding stage, with electronic responses due by the stated deadline.
Posted Date
Nov 3, 2025
Due Date
Dec 4, 2025
Release: Nov 3, 2025
City of Norco
Close: Dec 4, 2025
The City of Norco Public Works Department is soliciting bids to upgrade the Snipes Park Booster Station and replace the Lake Norconian Flow Control Station, including new hydropneumatic tank, pump upgrades, controls, and site improvements, plus construction of a new above-grade flow control station with solar power and telemetry. The procurement is a lump‑sum construction bid (not a grant), currently in the Bidding stage, with electronic responses due by the stated deadline.
AvailableWyoming Valley Sanitary Authority
The purpose of this project is to replace all existing pumps, valves and associated piping, as well as remove and install a stainless steel floor and to strip and paint the interior of the dry well at Pump Station-4S (PS-4S). The existing pumps are obsolete. The upgrades will be done inside the dry well of the pump station which is an underground steel can type structure that is accessed by a single vertical ladder. The dry well is approx. 96” dia. x 96” tall and the ground level to the dry well floor is approx. 20'-0”. WVSA will provide the new pumps ONLY. The Contractor will provide all new fabrications, piping components, valves, gaskets, hardware, pipe supports, paint, paint supplies, tools, equipment and labor etc. to complete the scope of the project per WVSA supplied drawings and specs.
Posted Date
Oct 30, 2025
Due Date
Nov 21, 2025
Release: Oct 30, 2025
Wyoming Valley Sanitary Authority
Close: Nov 21, 2025
The purpose of this project is to replace all existing pumps, valves and associated piping, as well as remove and install a stainless steel floor and to strip and paint the interior of the dry well at Pump Station-4S (PS-4S). The existing pumps are obsolete. The upgrades will be done inside the dry well of the pump station which is an underground steel can type structure that is accessed by a single vertical ladder. The dry well is approx. 96” dia. x 96” tall and the ground level to the dry well floor is approx. 20'-0”. WVSA will provide the new pumps ONLY. The Contractor will provide all new fabrications, piping components, valves, gaskets, hardware, pipe supports, paint, paint supplies, tools, equipment and labor etc. to complete the scope of the project per WVSA supplied drawings and specs.
AvailableCity of Charlotte
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
City of Charlotte
Close: Dec 19, 2025
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
AvailableEdgecombe County
The project includes the following work: 1. replace booster pump station building w/ associated piping. 2. permanent back-up generator. 3. SCADA. 4. (3) skid mounted booster pumps. 5. chemical feed system. 6. (2) 16 x 16 x 12-inch tapping sleeves with 12-inch valves. 7. earthwork. 8. 12 FT gravel drive.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Edgecombe County
Close: Dec 16, 2025
The project includes the following work: 1. replace booster pump station building w/ associated piping. 2. permanent back-up generator. 3. SCADA. 4. (3) skid mounted booster pumps. 5. chemical feed system. 6. (2) 16 x 16 x 12-inch tapping sleeves with 12-inch valves. 7. earthwork. 8. 12 FT gravel drive.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis