Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The procurement is for highway construction, specifically the installation of two fish passable structures, retaining walls, grading, stream realignment, HMA paving, pavement marking, guardrail, temporary erosion control, planting, and traffic control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Projects that will sustain or improve migratory passageways for diadromous fish. Diadromous (sea-run) fish enter coastal rivers each spring on spawning or foraging migrations. The Owner routinely partners with municipalities to restore former migratory routes, maintain existing fishways, improve related infrastructure, and conduct stream maintenance.
Posted Date
Feb 26, 2024
Due Date
Feb 26, 2027
Release: Feb 26, 2024
Close: Feb 26, 2027
Projects that will sustain or improve migratory passageways for diadromous fish. Diadromous (sea-run) fish enter coastal rivers each spring on spawning or foraging migrations. The Owner routinely partners with municipalities to restore former migratory routes, maintain existing fishways, improve related infrastructure, and conduct stream maintenance.
AvailableReplace a buried approx. 120 LF 4' CMP with an open bottom custom arch pipe structure. Work includes temp access road during construction, excavation of approx 5,000 CY of earthwork, procurement and installation of a 20' span x 16' rise arch pipe, provision of engineered precast footings, installation of 170 sf of gabion wire wingwalls, and backfill on the County gravel road.
Posted Date
Nov 10, 2025
Due Date
Jan 22, 2026
Release: Nov 10, 2025
Close: Jan 22, 2026
Replace a buried approx. 120 LF 4' CMP with an open bottom custom arch pipe structure. Work includes temp access road during construction, excavation of approx 5,000 CY of earthwork, procurement and installation of a 20' span x 16' rise arch pipe, provision of engineered precast footings, installation of 170 sf of gabion wire wingwalls, and backfill on the County gravel road.
AvailableThe objective of this research is to develop a guide that documents effective practices for wildlife passage and habitat connectivity. At a minimum, the guide shall: be designed to benefit a multidisciplinary range of transportation practitioners responsible for wildlife permeability planning, project initiation, design, construction, maintenance, and monitoring; and consider a range of scenarios including target species considerations, site variables, and distinguishing between purpose-built versus existing retrofit, with the goal of presenting effective practices.
Posted Date
Dec 5, 2025
Due Date
Jan 29, 2026
Release: Dec 5, 2025
Close: Jan 29, 2026
The objective of this research is to develop a guide that documents effective practices for wildlife passage and habitat connectivity. At a minimum, the guide shall: be designed to benefit a multidisciplinary range of transportation practitioners responsible for wildlife permeability planning, project initiation, design, construction, maintenance, and monitoring; and consider a range of scenarios including target species considerations, site variables, and distinguishing between purpose-built versus existing retrofit, with the goal of presenting effective practices.
AvailableThe Illinois Department of Transportation (IDOT) is soliciting bids to replace structure number 083-7080 carrying Old Illinois 13 over an unnamed creek approximately 4.6 miles west of Harrisburg in Saline County. The work will replace the existing structure and include associated roadway and drainage improvements per plans and special provisions. Bids are due through IDOTâs iCX electronic bidding system on January 16, 2026, at 12:00 PM CT.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
The Illinois Department of Transportation (IDOT) is soliciting bids to replace structure number 083-7080 carrying Old Illinois 13 over an unnamed creek approximately 4.6 miles west of Harrisburg in Saline County. The work will replace the existing structure and include associated roadway and drainage improvements per plans and special provisions. Bids are due through IDOTâs iCX electronic bidding system on January 16, 2026, at 12:00 PM CT.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis