Retrieving RFP details
Release
Close
City of Foley
Work consists principally of site work, the installation of all utilities and general oversight for a prefabricated bathroom building to be set up. Installation of all below floor piping according to the attached plans and connecting to existing main utility lines approximately 75' from the new building site. Installation of rock base per attached plans. Provide a licensed electrician and licensed plumber on site during the delivery of the prefabricated building. Provide general oversight of installation and connectivity of all utilities before and during the delivery of the building.
Second Sail Development LLC
Work includes electrical service installation and site work.
West Goshen Township
Work consists of improving the existing amphitheater with a new roof, stage improvements, and a minor building addition to house a family bathroom.
City of Raleigh
The project consists generally of the following major items: 1. Site preparation, erosion controls and tree protection, site and utility improvements, site grading, and hydroseeding necessary for the installation of an outdoor pavilion structure. The pavilion will be installed via a separate contract with the pavilion vendor. Site contractor will be required to coordinate schedule and work with pavilion installer throughout the project. 2. Subgrade preparation and utility connections necessary for the pavilion installation are included in this project.
Release
Oct 17, 2025
Close
Nov 12, 2025