Retrieving RFP details
Release
Close
City of Raleigh
The project consists generally of the following major items: 1. Site preparation, erosion controls and tree protection, site and utility improvements, site grading, and hydroseeding necessary for the installation of an outdoor pavilion structure. The pavilion will be installed via a separate contract with the pavilion vendor. Site contractor will be required to coordinate schedule and work with pavilion installer throughout the project. 2. Subgrade preparation and utility connections necessary for the pavilion installation are included in this project.
274-PRCR-MARSHCRSITE2025
Butte County Housing Authority
Park place apartments site improvements project.
City of Neosho
Work includes of demolition, clearing and disposal of debris of old restroom building, and build a new pavilion and restroom. Site preparation; demolition of building; pour a concrete slab, build a pavilion and one ada compliant unisex restroom under pavilion; electrical lighting and receptacles; guttering; connect utilities - sewer and water; stub-out electrical 5 feet from new pavilion; connect sidewalk to pavilion; clean up and site restoration. Demolition will be clearing and removal of debris of the old restrooms. Concrete slab will be approximately 24 feet wide x 40 feet long with 4-inch thickness with 2'x2' footings. Concrete slab will run east to west. See outside link.
Reed Township
Outdoor covered pavilion with bathrooms and small kitchen measuring 60 ft x 40 ft.
Release
Oct 17, 2025
Close
Nov 13, 2025