Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 1,542 LF 8" watermain trenched C900 , 40 LF watermain trenched C900 6", 3 EA 6" fitting cap, 2 EA 8" fitting cap, 1 EA 6" fitting tee, 1 EA 8" fitting tee, 4 EA 8"x6" fitting tee, 2 EA 8" 22.5 degree bend, 1 EA 8" fitting cross, 1 EA 8"x6" fitting cross, 3 EA connect to exiting water main, 7 EA 6" valve gate, 6 EA 8" valve gate, 4 EA fire hydrant assembly, 1,075 CU YD topsoil, 200 CU YD Excavation and Embankment Class 10, 3,378 SQ YD 12" Subgrade preparation, 1,428 LF 4" subdrain Perforated with sock HDPE, 1,466 LF 6" Sump pump line PVC, 1,930 LF 8" watermain tranched c900, 3,033 SQ YD 6" Pavement PCC with integral curb and gutter, 2,890 LF silt fence, istal, maintain and removed. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes construction of the water, sanitary sewer, drainage facilities, paving, and appurtenances
Posted Date
Dec 2, 2025
Due Date
Dec 17, 2025
Release: Dec 2, 2025
Close: Dec 17, 2025
Work includes construction of the water, sanitary sewer, drainage facilities, paving, and appurtenances
AvailableLawn mowing and maintenance at the OSU Extension Center. Contract covers 01/01/26 - 12/31/26.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
Close: Dec 12, 2025
Lawn mowing and maintenance at the OSU Extension Center. Contract covers 01/01/26 - 12/31/26.
Provide Poplar Harvest Services.
Posted Date
Nov 26, 2025
Due Date
Jan 9, 2026
Release: Nov 26, 2025
Close: Jan 9, 2026
Provide Poplar Harvest Services.
AvailableProject includes approx. 464 LF Furnish and Install 12-Inch AWWA C-900 PVC Pipe, Including Fittings, Joint Restraints, Conductive Tracer Wire, and Appurtenances with Standard Bedding and Backfill, Complete in Place; 45 LF Trenchless Construction of 12-Inch Waterline, AWWA C900 PVC Retrained Joint Pipe, including access pits and appurtenances, Complete in Place; 172 LF Trenchless Construction of 20-Inch Steel Casing with 12- Inch Waterline, AWWA C-900 PVC Restrained Joint Pipe, including access pits and appurtenances, Complete in Place; 27 LF Removal of 12-Inch waterline, AWWA C-900 PVC Pipe, and Appurtenances, Complete in Place; 352 LF urnish and Install 8-Inch ASTM D3034 SDR 26 PVC pipe, with standard bedding and backfill, greater than 10 feet depth, Complete in Place; See Attached file
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Project includes approx. 464 LF Furnish and Install 12-Inch AWWA C-900 PVC Pipe, Including Fittings, Joint Restraints, Conductive Tracer Wire, and Appurtenances with Standard Bedding and Backfill, Complete in Place; 45 LF Trenchless Construction of 12-Inch Waterline, AWWA C900 PVC Retrained Joint Pipe, including access pits and appurtenances, Complete in Place; 172 LF Trenchless Construction of 20-Inch Steel Casing with 12- Inch Waterline, AWWA C-900 PVC Restrained Joint Pipe, including access pits and appurtenances, Complete in Place; 27 LF Removal of 12-Inch waterline, AWWA C-900 PVC Pipe, and Appurtenances, Complete in Place; 352 LF urnish and Install 8-Inch ASTM D3034 SDR 26 PVC pipe, with standard bedding and backfill, greater than 10 feet depth, Complete in Place; See Attached file
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis