Retrieving RFP details
Release
Close
Town of Ethel
Work includes Replacement of valves in outlet structure; Rehabilitation of a pump station; Sewer system rehabilitation with cleaning, video inspection, point repairs, cured-inplace pipe, manhole rehabilitation, and miscellaneous work .
121-20251003095326 ETHEL
Town of Ethel
Work includes replacement of valves in outlet structure, rehabilitation of a pump station, sewer system rehabilitation with cleaning, video inspection, point repairs, cured-in- place pipe, manhole rehabilitation, and miscellaneous work.
City of Shaw
Construction of sewer system improvements. The project consists of the following approximate items/quantities: 1,200 feet of 8" 12" gravity sewer line replacement; 13-48" manhole replacement; gravity sewer line point repairs; post treatment aeration; flow monitoring equipment; lagoon levee rip rap stabilization; miscellaneous electrical work; miscellaneous resurfacing & appurtenances.
City of Edgewater
Work consist of approx. 7,880 LF of 8" sanitary sewer, approx. 300 vertical feet and lining of approx. 360 LF of 6" sanitary sewer, bypassing shall be included to maintain sewer service to all residents. Installation of sewer lining and manhole lining shall maintain in-situ conditions.
Release
Oct 09, 2025
Close
Nov 10, 2025