Retrieving RFP details
Release
Close
City of Shaw
Construction of sewer system improvements. The project consists of the following approximate items/quantities: 1,200 feet of 8" 12" gravity sewer line replacement; 13-48" manhole replacement; gravity sewer line point repairs; post treatment aeration; flow monitoring equipment; lagoon levee rip rap stabilization; miscellaneous electrical work; miscellaneous resurfacing & appurtenances.
333-20250910093141 SHAW
Town of Ethel
Work includes Replacement of valves in outlet structure; Rehabilitation of a pump station; Sewer system rehabilitation with cleaning, video inspection, point repairs, cured-inplace pipe, manhole rehabilitation, and miscellaneous work .
Town of Plantersville
Sewer system improvements. Work consists of: 1,150 tons of stone riprap (200 lbs) lagoon levee stabilization, 701' of 10" gravity sewer line, 1,237' of 8" gravity sewer line, 13 manholes, 600' of 4" service line, service connections, open-cut and bored steel encasements, bituminous resurfacing, and any additional miscellaneous appurtenances.
Town of Magnolia
2023 Sanitary Sewer Project Contract No. 1 - Sun Valley MHP Sanitary Sewer Improvements.
Release
Sep 10, 2025
Close
Nov 05, 2025