Retrieving RFP details
Release
Close
Town of Plantersville
Sewer system improvements. Work consists of: 1,150 tons of stone riprap (200 lbs) lagoon levee stabilization, 701' of 10" gravity sewer line, 1,237' of 8" gravity sewer line, 13 manholes, 600' of 4" service line, service connections, open-cut and bored steel encasements, bituminous resurfacing, and any additional miscellaneous appurtenances.
19-20250926084431 PLANTERSVILLE
Town of Plantersville
This Project consists of: 1,150 tons of stone riprap (200 lbs) lagoon levee stabilization, 701 LF of 10" gravity sewer line, 1,237 LF of 8" gravity sewer line, 13 manholes, 600 LF of 4" service line, service connections, open-cut and bored steel encasements, bituminous resurfacing, and any additional miscellaneous appurtenances.
City of Shaw
Construction of sewer system improvements. The project consists of the following approximate items/quantities: 1,200 feet of 8" 12" gravity sewer line replacement; 13-48" manhole replacement; gravity sewer line point repairs; post treatment aeration; flow monitoring equipment; lagoon levee rip rap stabilization; miscellaneous electrical work; miscellaneous resurfacing & appurtenances.
Turtle Mountain Band of Chippewa Indians
Construction of BIA 10 and green acres sewer and lift station improvements.
Release
Sep 30, 2025
Close
Oct 30, 2025